Solicitation, total small business set-aside, first published as presolicitation
Moon Lake Waterline
1240LT24R0030
Forest Service, Ashley National Forest. Commercial and Institutional Building Construction.
Response deadline
May 16, 2024 at 7:00 PM EDT
Closed 907 days ago. Posted April 16, 2024, first published April 1, 2024. Scheduled to archive May 31, 2024.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2024
190 like it are open now in commercial and institutional building construction
- SABER V Hill AFB
Department of the Air Force, FA8201 AFSC Ol H Pzio
Closes in 7 daysNov 16 - Building 143 Concrete Scale Pad Expansion and Dock Leveler Replacement
Department of the Navy, NSWC Carderock
PresolicitationNAICS 236220Location not publishedN00167-27-SIMACQ-CD-102-0003Closes todayNov 9 - 657-27-103JB, FCA Replace Building 51 Roof, JB
Department of Veterans Affairs, 255-Network Contract Office 15
Sources soughtSDVOSBNAICS 236220Missouri36C25527Q0044Closes todayNov 9
All 190 open in commercial and institutional building construction
Description
As published on SAM.gov.
This project includes the installation of a new water well source to replace an existing spring water source at the Moon Lake Recreation Area on the Duchesne-Roosevelt River District of the Ashley National Forest. Specifically, this project focuses on the Lake Fork Trailhead and tank sites. The work includes:
1. Drilling of an 8" diameter well 2. Equipping the well with a submersible pump 3. Construction of a utility building and associated treatment and control equipment. 4. Installing electrical supply from nearby utility poles. 5. Installing new HDPE water supply and electrical control conductor between the utility building and tank. 6. Modifying and repairing selected appurtenances at the tank site. The bid is separated into two schedules.
Schedule 1 work must be completed and approved by the State of Utah before a notice to proceed will be issued for Schedule 2. Schedule 1 includes all work associated with drilling, casing, and testing an 8” diameter well. An optional bid item is desired for work that may be awarded if required:
Incidental Option #1: Well abandonment (if acceptable water is not found). Schedule 2 includes all work associated with equipping the well and installing water and electrical improvements required to connect to the water system. Alternative Options of which one will be selected include:
Alternate Option A: Installing steel drop pipe in the well.
Alternate Option B: Installing a flexible drop pipe in the well. Quantities associated with these items are identified in the Schedule of Items.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Derrick A Dodsonderrick.dodson@usda.gov
- Cathleen Christensencathleen.christensen@usda.gov