Solicitation, total small business set-aside
GAOA Historic Guinavah-Malibu Campground and Amphitheatre Reconstruction
1240LS25Q0002
Forest Service, Usda-Fs, Csa Intermountain 7. Other Heavy and Civil Engineering Construction.
Response deadline
August 28, 2025 at 1:00 PM EDT
Closed 431 days ago. Posted July 26, 2025. Scheduled to archive September 12, 2025.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2025
132 like it are open now in other heavy and civil engineering construction
- GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest
Forest Service, Usda-Fs, Csa Northwest 6
Combined synopsis and solicitationSmall businessNAICS 237990Garden City, UT1240BH27Q0002Closes in 19 daysNov 21 - GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes todayNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes todayNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
The Uinta-Wasatch-Cache National Forest has a need for campground Reconstruction at the Guinavah-Malibu Campground in Logan Canyon, Cache County, Utah The Guinavah-Malibu site includes a campground, group sites, trailhead, day-use area with picnic sites and a historical amphitheater. Special care to protect and retain existing CCC Historical features throughout the site is required.
Contract Base Bid and Option Item Descriptions Base: a. Constructing a new entrance road and central intersection, with Trailhead Parking, pull-out and kiosk b. Construct Right Turn Lane on US HWY 89. c. Obliterating All existing roads that are to be removed throughout campground. d. Removal All existing site furnishings (tables, concrete slabs, fire rings, water hydrants) throughout campground. e. Removal of 1 Slump Block toilet building. f. Construct Major Site Sign (Sign and Stone Base) off HWY 89. West Side Bid Option:
a. Constructing a new campground "loop", including new road, spurs, restrooms, family units and site furniture.
b. Realigning existing roads and intersections.
c. Installing new road signs and campsite unit numbers d. Install CXT Toilets East Side Bid Option: Constructing a new road and parking areas. Surfaces will be a mix of aggregate types. Install new bulletin boards. Constructing a new walk-in camping, a pathway system, signs, and site furniture.
Install CXT Toilets Asphalt Pavement Option: Place 3” asphalt pavement on Roads, Parking Areas, and Spurs.
Pavilions Option: Erect pavilions at group sites. Construct Group Sites with site furnishings Amphitheater Restoration Option: Removal of existing amphitheater seating planks and posts. Installing new wood plan benches and supports, Constructing accessible pathway Constructing new wood stairs Installing pathway lighting Construct pavilion with site furnishings Interpretive Trail with Bulletin Boards Option: Construct an Interpretive Trail with Single-Panel Bulletin Boards with a roof. The work anticipated under any contract resulting from the solicitation will be started approximately Fall 2025/Spring 2026 This is a total Small Business set aside. An additional site visit will not be held.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 26, 2025
Solicitation, originally presolicitation
Due August 28, 2025 at 1:00 PM EDT. SAM.gov, notice dae0b828c2684f45a773d4cda904f01f
Points of contact
- Chris Hansenchristine.m.hansen@usda.gov3855091895