Combined synopsis and solicitation, total small business set-aside
Sand Trail Phase II
1240BJ26Q0021
Forest Service, USDA Forest Service. Other Heavy and Civil Engineering Construction.
Response deadline
September 22, 2026 at 8:00 PM EDT
Closed 39 days ago. Posted September 15, 2026, first published August 7, 2026. Scheduled to archive October 30, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed 39 days ago
132 like it are open now in other heavy and civil engineering construction
- GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Bureau of Land Management, Colorado State Office
Combined synopsis and solicitationSmall businessNAICS 237990Colorado140L1726R0010Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR BETHANY BEACH AND SOUTH BETHANY BEACH, DE (CSRM - BEACHFILL), FENWICK ISLAND, DE (CSRM – BEACHFILL), REHOBOTH BEACH & DEWEY BEACH, DE (CSRM – BEACHFILL)
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990Bethany Beach, DEW912PM27BA005Closes tomorrowNov 2 - SOURCES SOUGHT NOTICE FOR PROJECT LABOR AGGREEMENTS (PLAs) TO COASTAL STORM RISK MANAGEMENT (CSRM) FOR CAPE MAY TO LOWER TOWNSHIP, NEW JERSEY, BRIGANTINE INLET TO GREAT EGG HARBOR INLET (ABSECON ISLAND), NEW JERSEY, AND BARNEGAT INLET TO LITTLE EGG, INLET
Department of the Army, W074 Endist Wilmington
Sources soughtNAICS 237990New JerseyW912PM27BA004Closes tomorrowNov 2
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Part 12. This announcement constitutes the only solicitation. Quotations are being requested and a separate written solicitation will not be issued.
Solicitation number 1240BJ26Q0021 is issued as a Request for Quotation (RFQ). This project is located on the Cordova Ranger District. This contract aims to repair and mitigate future failures of the USFS Sand Trail infrastructure, trail number 229. The total trail length is 12.20 miles long; this contract will only address the first 1.70 miles of failing trail. The mitigation consists of installing bank armoring with rip rap, and placing sub grade aggregate along the trail. The sub grade aggregate (3” minus) is to be placed as backfill behind the riprap and is incidental to item 201501A. Backfill quantities will vary but the end product is to have ~2-4 ft of 3” minus behind the placed riprap. The D-1 aggregate is to be placed on the trail running surface to harden the trail for ATV use.
The majority of trail 229 is 6 to 8 feet in width and will require additional clearing and minor excavation depending on type of equipment used.
Construction must occur during low water times of year, diversion of smaller channels within the project location will be needed to dewater bank locations. Small diversion for bank armoring is assumed to be conducted with either a dozer or excavator that may operate in the stream channel or along the stream bank. Work must be performed when there is 5 consecutive days below 30F degrees are reached
This acquisition is set-aside for small business concerns. The applicable North American Industry Classification Standard Code is 237990 Other Heavy and Civil Engineering Construction. The small business size standard is $45,000,000.00 This acquisition is a Total Small Business Set-Aside. All responsible sources may submit a quotation which will be considered by the agency.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Bid_Bond_SF24.pdf703 KB, August 7, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 7, 2026
Combined synopsis and solicitation
Due September 8, 2026 at 1:00 PM EDT. SAM.gov, notice e22d0da3a20f4a10ac77e03e930bc46a
3 revisions on SAM
- September 15, 2026: publish, combined synopsis and solicitation
- August 31, 2026: publish, combined synopsis and solicitation
- August 7, 2026: publish, combined synopsis and solicitation
August 31, 2026
Combined synopsis and solicitation
Due September 10, 2026 at 1:00 PM EDT. SAM.gov, notice d2ad3fb4a63848a19f7c913ef8b02fd5
3 revisions on SAM
- September 15, 2026: publish, combined synopsis and solicitation
- August 31, 2026: publish, combined synopsis and solicitation
- August 7, 2026: publish, combined synopsis and solicitation
September 15, 2026
Combined synopsis and solicitation
Due September 22, 2026 at 8:00 PM EDT. SAM.gov, notice 347cd55c30ab406d84b2dcdd5d0d40bd
3 revisions on SAM
- September 15, 2026: publish, combined synopsis and solicitation
- August 31, 2026: publish, combined synopsis and solicitation
- August 7, 2026: publish, combined synopsis and solicitation
Points of contact
- Eric Oldenkamperic.oldenkamp@usda.gov