Presolicitation, total small business set-aside
BPA Call: Wallowa Mountain Loop Road Asphalt Patching
1240BH24Q0023
Forest Service, Wallowa Whitman National Forest. Highway, Street, and Bridge Construction.
Awarded
$122,667.00 obligated so far on USAspending
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one was awarded in 2024
37 like it are open now in highway, street, and bridge construction
- PRIMARY RUNWAY AND PAVEMENT REPAIRS LOCATED AT JOINT RESERVE BASE NEW ORLEANS, LOUISIANA.
Department of the Navy, Navfacsyscom Southeast
PresolicitationNAICS 237310New Orleans, LAN6945027R0007Closes todayNov 4 - WY BR WYAO US20(1) US 20 and Hayden Arch Bridge Repairs
Federal Highway Administration, 6982AF Central Federal Lands Divisi
Sources soughtNAICS 237310Cody, WY6982AF27SS00001Closes todayNov 4 - Jake Rocks Road Reconstruction
Forest Service, Usda-Fs, Csa Southwest 7
Combined synopsis and solicitationSmall businessNAICS 237310Warren, PA127EAX27Q0003Closes tomorrowNov 5
Description
As published on SAM.gov.
THIS IS AN INFORMATIONAL NOTICE ONLY AND NOT A REQUEST FOR QUOTES. THIS IS A REQUEST UNDER A PREVIOUSLY ISSUED BPA. WE ARE NOT LOOKING TO ADD NEW CONTRACTORS TO THE BPA AT THIS TIME. Work includes, but is not limited to:
asphalt patching of USFS Route 39 (Wallowa Mountain Loop Road) from the Forest boundary to Mile Post 26. Asphalt repairs will consist of removing all loose damaged asphalt, cleaning area, applying tack coat and placing and compacting of hot mix asphalt skin patch. Damaged areas consist of potholes, spalled areas, depressions, and raveled or damaged pavement edges in roadway surfaces. Individual patch sizes vary, but generally will be 8’ – 12’ wide, 25’ – 200’ in length, and 1.5” – 3” depth.
Estimated start work date is 24 June 2024 and all work shall be complete by 1 September 2024. Magnitude of construction is between $100,000 and $250,000. This notice is for the issuance of a blanket purchase agreement call request on BPA Region 6 Road and Bridge Construction 1240BH23Q0001.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Hampton Paving LLC
- UEI
- G9M5H1KRDBA3
- CAGE
- 3LBK6
- Vendor location
- Island City, OR
- Contract
- 1240BH24F0038 under 1204T020A0015, bpa call
- Obligated
- $122,667.00
- Actions
- 2 between June 5, 2024 and August 6, 2024
- Competition
- Competed Under SAP, 1 offer received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Wallowa Mountain Loop Road Asphalt Patching
- Match
- solicitation number 1240BH24Q0023 equals the FPDS solicitation identifier; same sub-agency 12C2 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 22, 2024
Presolicitation
Due May 7, 2024 at 7:00 PM EDT. SAM.gov, notice 01509e41540e4e6080c4178de3eeaefe
Points of contact
- Darcy J Rapozadarcy.rapoza@usda.gov5417507116