Skip to content
  • 6,812 federal solicitations are open right now. How many of them are yours?
  • New solicitations are posted every day. The ones you never saw are the ones you cannot win.
  • Stop checking SAM.gov every morning. Let the contracts that fit your business come to you.
  • Tell Abierto what you sell in one sentence. AI reads every open solicitation for you.
  • Deadlines are short. Hear about a solicitation the day it is posted, not the week it closes.
  • Amendments move deadlines. Watch a solicitation and Abierto tells you when it changes.
  • See which contracts in your field are about to end, and who holds them today.
  • Plans from $39 a month. See your matches before you pay.
See plans
AbiertoGet started

Combined synopsis and solicitation, total small business set-aside

Idaho Panhandle National Forest UTV and Track Set Purchase

1240BD27Q0006

Forest Service, Usda-Fs, Csa Northwest 2. All Other Transportation Equipment Manufacturing.

Response deadline

October 28, 2026 at 2:00 PM EDT

Closed 4 days ago. Posted October 14, 2026. Scheduled to archive November 12, 2026.

Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities

This one closed 4 days ago

1 like it is open now in all other transportation equipment manufacturing

Description

As published on SAM.gov.

This is a combined synopsis/solicitation for commercial products prepared in accordance with the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

The U.S. Forest Service (USFS), Idaho Panhandle National Forests, has a requirement for the procurement and delivery of one (1) Utility Task Vehicle (UTV) and one (1) compatible all-season track kit. The equipment will be utilized by the Fire/Fuels program for wildland fire suppression and prescribed fire operations over severe, uneven terrain.

All equipment must be delivered new, fully assembled, fluids serviced, and in a 100% turnkey state ready for immediate field deployment upon arrival. Note: The UTV does not have to arrive with the track set physically installed on the vehicle. However, the vehicle must be fully prepped and the track kit must arrive brand new, complete, and ready to be installed by a certified dealer

To be considered responsive, contractors must submit combined pricing for both line items below:

  • CLIN 0001: Utility Task Vehicle (UTV)
    • Quantity: 1 EA
    • Delivery Location: IDAHO PANHANDLE NATIONAL FORESTS SUPERVISORS OFFICE
      3232 WEST NURSERY ROAD
      COEUR D'ALENE ID 83815
  • CLIN 0002: All-Season Track Kit
    • Quantity: 1 EA
    • Specifications: Must be 100% factory-compatible, field-interchangeable, and align directly with the vehicle awarded under CLIN 0001.

Salient Characteristics (Minimum Technical Specifications)

Proposed vehicles must meet or exceed the following design limits and features:

  • Engine & Cooling: 4-stroke, liquid-cooled engine.
  • Cylinder Displacement: Min: 998 cc | Max: 1500 cc.
  • Horsepower: Min: 80 hp | Max: 150 hp.
  • Dimensions: Length (120–138 in), Width (63–66 in), Height (76–82 in).
  • Ground Clearance: Min: 13 in | Max: 20 in.
  • Capacities: Person Capacity (2–3), Payload (1000–1700 lbs), Box Capacity (1000–1500 lbs), Towing Capacity (2500–3500 lbs).
  • Tires: 8 to 10 ply; Size Min: 27 x 9 x 14 | Max: 30 x 11 x 15.
  • Included Accessories/Features: Enclosed cab with full doors, hard top roof, glass full tip-out windshield with wipers, sliding window rear panel, heater/defroster, protection headache rack, front/rear a-arm protectors, skid plate, front/rear bumpers, fender flares, rock sliders, chainsaw mount, LED light bar, rearview mirror, and a >4,500 lb winch.
  • Track Specs: Rubber tracks with a steel frame designed for all-season flotation/traction. Minimum 2-year warranty on tracks; minimum 1-year warranty on the UTV.
  • Origin: Must be manufactured in the U.S.

Delivery & Shipping Terms

  • Delivery Timeline: All items must be physically delivered within 90 calendar days from the formal date of award.
  • Shipping: FOB Destination. Pricing must be fully inclusive of all freight, handling, and delivery charges. The contractor is responsible for offloading equipment at the specified  facility. No loading dock or equipment available to unload.
  • UTV does not have to arrive with tracks installed but kit must be ready to be installed by a certified 

Evaluation and Basis for Award

The Government will conduct a Side-by-Side Comparative Evaluation of quotes in accordance with simplified commercial procedures (FAR 12.201-1 and 12.205(c)(2)). Formal scoring matrices will not be used. A single Firm-Fixed-Price (FFP) contract will be awarded based on the following factors:

  1. Technical Capability & Salient Characteristics: Degree to which the solution meets or exceeds design limits and accessory bundles.
  2. Delivery Timeline: Preference/favorable evaluation may be given to shorter delivery timelines than the mandatory 90 days.
  3. Price: Evaluated to ensure fairness and reasonableness.

Submission Requirements

Interested vendors must have an Active Registration in SAM (https://sam.gov) at the time of quote submission. Omitting a Unique Entity ID (UEI) will exclude the quotation package from consideration.

Quotation packages must be organized in the following order and submitted via email to mindy.hickman@usda.gov: Failure to provide these documents will result in your offer being exluded from concideration. Spec sheets must be provided to complete an evaluation.

  1. SF-1449: Completed and signed (Blocks 17a, 30a, 30b, and 30c; including telephone, email, and SAM UEI in Block 17a).
  2. SF-30 Amendments: Acknowledged and signed (if any are posted by the CO).
  3. Schedule of Items: Completed pricing for CLIN 0001 and CLIN 0002.
  4. Technical Documentation: Drawings, spec sheets, or product brochures verifying compliance with salient characteristics.

Closing Date for Receipt of Quotes: On or before 28 October 2026 no later than 11:00 AM PDT.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 14, 2026

    Combined synopsis and solicitation

    Due October 28, 2026 at 2:00 PM EDT. SAM.gov, notice 168a35386f8c4240ae2e1345418c0101

    1 revisions on SAM
    • October 14, 2026: publish, combined synopsis and solicitation

Points of contact