Special notice
Intent to Sole Source/ Notice of Intent
1173382
Forest Service, Usda-Fs, Csa East 6. Prefabricated Metal Building and Component Manufacturing.
Response deadline
July 31, 2026 at 4:00 PM EDT
Closed 93 days ago. Posted July 20, 2026. Scheduled to archive August 15, 2026.
Get the next one like this from Forest Service by email, the day it is posted.Find my opportunities
This one closed in 2026
7 like it are open now in prefabricated metal building and component manufacturing
- ROOF TARPS
Defense Logistics Agency, DLA Maritime - Puget Sound
Combined synopsis and solicitationSmall businessNAICS 332311Anywhere in the USSPMYM227Q1113Closes tomorrowNov 2 - ID-KOOSKIA NFH-FORMALIN STORAGE BLDG
Departmental Offices, FWS Contracting Activity
Combined synopsis and solicitationSmall businessNAICS 332311Location not published140FF027Q0032Closes in 4 daysNov 5 - Arkabutla Lake Water Plant Rehab and Pre-fabricated Metal Building Installation
Department of the Army, W07V Endist Vicksburg
Combined synopsis and solicitationSmall businessNAICS 332311Anywhere in the USW912EE27QA002Closes in 5 daysNov 6
All 7 open in prefabricated metal building and component manufacturing
Description
As published on SAM.gov.
The U.S. Department of Agriculture (USDA) Forest Service, Procurement Operations (PROPS), East Zone, CSA East 6, intends to award a sole-source, firm-fixed-price contract to A & A Sheet Metal Products (SECURALL) under the authority of FAR 13.106-1(b).
Requirement: Acquisition of one (1) pre-fabricated Agri-Chemical storage container to be delivered and offloaded to a pre-existing concrete pad at the Mark Twain National Forest, Salem Ranger District. The structure will be utilized for the safe storage of US Forest Service tracer paint.
Justification Details: SECURALL is the Sole Original Equipment Manufacturer (OEM) of this industrial unit. Sourcing from alternative providers is restricted due to technical and structural constraints:
- Foundation Match: The existing concrete pad at the Salem RD compound was engineered, poured, and set to the exact structural layout specifications provided by SECURALL.
- Cost & Delay Avoidance: Sourcing a different manufacturer would require physical demolition, structural modifications, or a complete re-pouring of the foundation pad, causing a substantial duplication of government costs and severe operational delays.
- Safety & Compliance: The unit features a unique, heavy-gauge galvannealed double-wall steel system capable of withstanding winds up to 250 mph and includes a built-in 12-gauge liquid-tight continuously welded steel sump flooring system for secondary spill containment. This exact model satisfies specific EPA and OSHA-approved safety criteria required on-site.
This notice is not a request for competitive proposals. However, interested parties may submit a capability statement to the Contracting Officer within the posting period to be considered by the agency. A determination by the Government not to compete this proposed action based upon responses to this notice is solely within the discretion of the Government.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 20, 2026
Special notice
Due July 31, 2026 at 4:00 PM EDT. SAM.gov, notice b8384e7332e245ce9c1795df2374622d