Sources sought
ME-32 South Grand Cheiner Marsh Creation
1167159
Farm Production and Conservation Business Center, Fpac Bus Cntr-Acq Div. Other Heavy and Civil Engineering Construction.
Response deadline
July 16, 2026 at 12:00 PM EDT
Closed 108 days ago. Posted July 1, 2026, first published June 16, 2026. Scheduled to archive July 31, 2026.
Get the next one like this from Farm Production and Conservation Business Center by email, the day it is posted.Find my opportunities
This one closed in 2026
132 like it are open now in other heavy and civil engineering construction
- Calcasieu River and Pass, Bar Channel Hopper Dredge Rental Contract No. 2-2025, Cameron Parish, Louisiana. Specification Nos. OM25126
Department of the Army, W07V Endist New Orleans
SolicitationNAICS 237990LouisianaW912P825B0020Closes in 33 daysDec 4 - Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 1-2025, Cameron Parish, Louisiana. Specification Nos. OM25125
Department of the Army, W07V Endist New Orleans
SolicitationNAICS 237990LouisianaW912P825B0019Closes in 33 daysDec 4 - Calcasieu River and Pass, Bar Channel Hopper Dredge Contract No. 3-2025, Cameron Parish, Louisiana. Specification Nos. OM25127
Department of the Army, W07V Endist New Orleans
SolicitationNAICS 237990LouisianaW912P825B0021Closes in 33 daysDec 4
All 132 open in other heavy and civil engineering construction
Description
As published on SAM.gov.
THIS IS A SOURCES SOUGHT NOT A SOLICITATION
The USDA-FPAC BC is posting this sources sought to identify interested contractors/firms for the following project:
Brief description:
The South Grand Chenier Baker Tract Marsh Creation (ME-32) project is located in the Mermentau Basin, Chenier Sub-Basin, and
Hog Bayou Watershed south of LA Hwy 82 and directly west of Rockefeller Wildlife Refuge. Material dredged from the Gulf of
America will be used to create and nourish approximately 466 acres of marsh in southwest Louisiana. Approximately 20,375 LF of
earthen containment dike will be constructed. The goal of the project is to create new wetland habitat, restore degraded marsh, and
reduce wave erosion of organic soils.
Attachment 01 - ME-32 Construction SOW provides further detail
FAR 36.204 — Disclosure of the Magnitude of Construction Projects : More than $10,000,000
Possible 100% FULL AND OPEN COMPETITION
If you are interested and capable please email your capability statement, Cage Code, point of contact information, and a brief outline of your past expirience (no more than 1 page) to Marilyn MacTaggart at marilyn.mactaggart@usda.gov NLT 16 JULY 2026 at 12:00PM EST.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Attachment 01- ME-32 Construction SOW 3_2026.pdf284 KB, June 16, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 16, 2026
Sources sought
Due July 16, 2026 at 12:00 PM EDT. SAM.gov, notice f7c727c8583a45d2b38ecc60054c4f0c
2 revisions on SAM
- July 1, 2026: publish, sources sought
- June 16, 2026: publish, sources sought
July 1, 2026
Sources sought
Due July 16, 2026 at 12:00 PM EDT. SAM.gov, notice dbd8806d4cc34814945264f0c35cea9a
2 revisions on SAM
- July 1, 2026: publish, sources sought
- June 16, 2026: publish, sources sought
Points of contact
- MARILYN MACTAGGARTMarilyn.MacTaggart@usda.gov