Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

North Fork Negrito Fence

1123855

Forest Service, Usda-Fs, Csa Southwest 5. All Other Specialty Trade Contractors.

Response deadline

May 22, 2024 at 6:00 PM EDT

Closed 849 days ago. Posted May 14, 2024, first published May 1, 2024. Scheduled to archive June 6, 2024.

Description

As published on SAM.gov.

Modified solicitation by extending soliciatation clsoing daye, added question and answer document, ariel map and revised Statement of Work. The USDA Forest Service Gila National Forest, Reserve Ranger District, New Mexico, is seeking to remove the existing exclosure fence which is a 4-strand barbed wire and metal post fence and install a 2-rail metal pipe / 2-wire smooth strand exclosure fence around the North Fork Negrito Creek site.

The contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete the project The contractor shall be responsible for furnishing all labor, equipment, transportation, and specified materials/supplies necessary to complete a 2-rail metal pipe / 2-wire smooth strand exclosure fence around the North Fork Negrito Creek exclosure site. The total length of pipe rail fence to be installed in 0.51 miles.

The work to be completed includes transportation of metal pipe (supplied by the U.S. Forest Service) from the Reserve Ranger District Office in Reserve, NM to the project site, installation (including cutting and welding of the metal pipe rails and setting of the pipe posts) of the new pipe rail fence according to the specifications listed in Appendix A, and removal and disposal of the existing barbed wire fencing material.

The existing North Fork Negrito Creek exclosure fence is a 4-strand barbed wire and metal post fence located along the North Fork of Negrito Creek. The exclosure fence purpose to protect the riparian area along the creek by prohibiting entry inside the exclosure by domestic livestock. Due to environmental conditions at the site the fence is often damaged due to falling trees or flood waters creating gaps making livestock entry possible.

The intent of this project is to replace the barbed wire fence with a welded, 2-rail metal pipe / 2-wire smooth strand fence that is more robust to floods and other disturbances.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 1, 2024

    Combined synopsis and solicitation

    Due May 17, 2024 at 6:00 PM EDT. SAM.gov, notice 57c2d9b26b6e4ffe9c345eceb55a8408

  2. May 13, 2024

    Combined synopsis and solicitation

    Due May 17, 2024 at 6:00 PM EDT. SAM.gov, notice 3b8250ced17840559e5c68bdd30c8114

  3. May 13, 2024

    Combined synopsis and solicitation

    Due May 22, 2024 at 6:00 PM EDT. SAM.gov, notice 8c0aad9290d7434786b86b6d6c2de768

  4. May 14, 2024

    Combined synopsis and solicitation

    Due May 22, 2024 at 6:00 PM EDT. SAM.gov, notice 53ba3fb70cb44adba7d1d4342579f670

  5. May 14, 2024

    Combined synopsis and solicitation

    Due May 22, 2024 at 6:00 PM EDT. SAM.gov, notice 55bfa0877c8349d9bf704395ccd574da

Points of contact

  • Reforestation Tree Shelters
    Combined synopsis and solicitationSmall businessNAICS 113210Luna, NM127EAv26Q0094
    Closes todaySep 18
  • Horse Panels
    Combined synopsis and solicitationSmall businessNAICS 332323Arizona127EAV26Q0119
    Closes todaySep 18