Solicitation
089495-24-A-0024
089495-24-A-0024
Postal Service, Supplies Material MGMT. Commercial and Institutional Building Construction.
Response deadline
August 5, 2024 at 2:00 PM EDT
Closed 818 days ago. Posted July 23, 2024. Scheduled to archive August 20, 2024.
Get the next one like this from Postal Service by email, the day it is posted.Find my opportunities
This one closed in 2024
184 like it are open now in commercial and institutional building construction
- CRAC Units Replacement for MCE 1211 at GFAFB, ND
Department of the Air Force, FA4659 319 Cons PK
Combined synopsis and solicitationSmall businessNAICS 236220Grand Forks AFB, NDFA465927QM001Closes in 23 daysNov 24 - REQUEST FOR INFORMATION (RFI) / MARKET RESEARCH NOTICE RELATED TO SEVERAL UPCOMING PROJECTS at WRIGHT-PATTERSON AFB, OHIO
Department of the Army, W072 Endist Louisville
Sources soughtNAICS 236220Wright-Patterson AFB, OHWright-Patterson Air Force BaseW912QR26_RFI_CONSOLIDATEDPROJECTS_WPAFBCloses tomorrowNov 2 - JB Charleston Multiple Award Construction Contract
Department of the Air Force, FA4418 628 Cons PK
SolicitationNAICS 236220South CarolinaFA441826R0009Closes tomorrowNov 2
All 184 open in commercial and institutional building construction
Description
As published on SAM.gov.
1.2 SUMMARY OF ROOF REPLACEMENT WORK – AREAS A & B A. Asbestos laboratory analysis report: Refer to Section 022623 for information relating to the location of ACM, if applicable, within project areas. If positive refer to Sections 013543 and 028233 for procedures and requirements related to the removal and disposal of non-friable asbestos related to this project.
B. Roof removal and substrate preparation: Remove existing roof system down to the structural deck, including roof membrane(s), and underlying insulation, underlayments, and additional roof membranes. Inspect the existing structural deck, and inform the Owner immediately of observed damage and or deterioration. Temporarily displace rooftop equipment as necessary to complete the specified work.
Refer to Section 024100. C. Provide an alternate price for complete refastening of existing structural decks; provide a unit price for areas of existing structural deck that require refastening. Note that refastening of perimeter wood blocking is required. Existing metal panel roof system is to be fasten through the underlying insulation and metal panel roof system into the existing structural purlins. Refer to Section 053123 for re-fastening requirements.
D. After roof removal and inspection of the existing structural deck and perimeter wood blocking, perform repairs to the structural deck, as determined necessary by the Owner. Refer to Section 053123. Replace damaged or deteriorated wood blocking, as determined necessary by the Owner. Refer to Section 061053. E. Provide required
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 23, 2024
Solicitation
Due August 5, 2024 at 2:00 PM EDT. SAM.gov, notice 1efdcef48ca042528be58aa00f2639e0