Sources sought
Argon Piping Supply, Installation and Testing
04012026
Department of Energy, Fermilab - DOE Contractor.
Response deadline
April 30, 2026 at 4:00 PM EDT
Closed 185 days ago. Posted April 1, 2026. Scheduled to archive May 15, 2026.
Get the next one like this from Department of Energy by email, the day it is posted.Find my opportunities
Description
As published on SAM.gov.
As part of the DUNE experiment, approximately 40,000 metric tons of Argon is required to be transported from the surface to the Central Utility Cavern (CUC) at the 4850 Level. This Argon will arrive at the Ross Shaft Argon Receiving station in liquid form where it will be stored in tanks. It will then be converted to the gaseous phase, where it will be transported underground through a stainless-steel pipeline. This pipeline will be 8” diameter Schedule 10 between the Argon Receiving Facility and the Ross shaft, 6” diameter schedule 10 from Ross shaft collar to the 4850 Level, then return to 8” diameter schedule 10 from the Ross shaft to the CUC.
This SOW defined as “Argon Gas Piping Supply and Installation for LBNF” outlines the requirements for the supply, installation and testing of a stainless-steel pipeline at LBNF as described above
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- RFI.zip124.3 MB, April 1, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 1, 2026
Sources sought
Due April 30, 2026 at 4:00 PM EDT. SAM.gov, notice 42d2549de2d24ca88b37d36772f00fb0
1 revisions on SAM
- April 1, 2026: publish, sources sought
Points of contact
- Jerry Kingjking@fnal.gov2173901120