Combined synopsis and solicitation, total small business set-aside
USCGC Alder Cargo Hatch Welding
70z08526Q0024676
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
May 11, 2026 at 11:00 AM EDT
Closed 130 days ago. Posted April 30, 2026. Scheduled to archive May 26, 2026.
Description
As published on SAM.gov.
Statement of Work USCGC ALDER (WLB 216) Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew 1. Purpose and Scope . KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping located in compartment 2-30-0-AA, Cargo Hold. 2. Deliverables and Performance Requirements . Protective measures: The KTR must furnish and install all protective measures IAW SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). .
Interferences: The KTR must handle all interferences IAW SFLC Std Spec0000, (Interferences). . Contamination prevention: The KTR must take all precautions to prevent contamination of personnel and spaces IAW all applicable Federal, state, and local regulations. . Fluid handling: The KTR must remove and dispose of removed fluids from the affected piping system, IAW all applicable Federal, state, and local regulations. Do not drain any fluids into any spaced, bilge, or exterior location. .
Piping renewal particulars: The KTR must accomplish the following tasks, using Coast Guard Drawing 225–WLB–528–001, REV K as guidance: o Crop out necessary length of piping (3” & 2” diameter), to include all necessary funnel pieces of the cofferdam system. o Fabricate necessary piping arrangement previously cropped IAW CG Drawing. o Install all fabricated piping to include all required gaskets/seals IAW CG Drawing. o KTR must provide a means of sealing any open piping while any portion of the system is open (i.e.: upstream valve blind flange). . Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary. . Pipe labeling: The KTR must label affected piping as follows:
o Name of the piping system service. o Destination, where feasible. o Direction of flow, indicated by an arrow three inches long pointing away from the lettering. .
Leak Test: After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the Contractor must test the affected piping system's operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. .
Touch-up preservation: The KTR must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.) . Piping insulation installation: The KTR must install new insulation materials over the exposed pipe surfaces at thicknesses appropriate to the application and temperature ranges specified in ASTM F683 Tables.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 30, 2026
Combined synopsis and solicitation
Due May 11, 2026 at 11:00 AM EDT. SAM.gov, notice 6b6676b2d9c540c19a86465f50635c2e
Points of contact
- Lindsay Mongiovilindsay.n.mongiovi@uscg.mil5716086752
- Justin Wooldridgejustin.r.wooldridge2@uscg.mil2068205327
Also open from this buyer
- USCGC POLAR STAR MOBILE DTECombined synopsis and solicitationSmall businessNAICS 424720Seattle, WA14501_MOBILE_DTE_FY26Closes tomorrowSep 19
- Heater ElectricSolicitationSmall businessNAICS 333414Maryland70Z08526Q30113B00Closes tomorrowSep 19
- Open, Inspect, Repair Cylinder Assy.Combined synopsis and solicitationSmall businessNAICS 81131070Z08526P49025B00Closes in 3 daysSep 21
- USCGC Stratton Shaft Alignment and Bearing Reaction CheckCombined synopsis and solicitationSmall businessNAICS 811310Alameda, CA70Z08526Q0026058Closes in 3 daysSep 21
- CGC ANVIL QUICK ACTING WATER TIGHT SCUTTLESCombined synopsis and solicitationSmall businessNAICS 336611Charleston, SC70Z08526Q0027390Closes in 3 daysSep 21