# USCGC Alder Cargo Hatch Welding

Canonical: https://abierto.us/opportunities/70z08526q0024676

- Solicitation number: 70z08526Q0024676
- Notice type: Combined synopsis and solicitation
- Status: Closed. Deadline was May 11, 2026 at 11:00 AM EDT
- Department: Department of Homeland Security
- Agency: US Coast Guard
- Contracting office: SFLC Procurement Branch 2 (70Z085)
- NAICS: 336611 Ship Building and Repairing
- Product or service code: J020 Maintenance, Repair and Rebuilding of Equipment: Ship and Marine Equipment
- Set-aside: Total small business set-aside
- Place of performance: San Francisco, California
- County: San Francisco County (FIPS 06075). https://abierto.us/counties/san-francisco-county-ca-06075
- City: San Francisco. https://abierto.us/cities/san-francisco-ca-0667000
- First posted: April 30, 2026
- Last posted: April 30, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/6b6676b2d9c540c19a86465f50635c2e/view

## Description

Statement of Work USCGC ALDER (WLB 216) Cargo Hold Hatch Cofferdam Drain Piping Crop & Renew 1. Purpose and Scope . KTR shall renew necessary portions of the cargo hold hatch cofferdam drain piping located in compartment 2-30-0-AA, Cargo Hold. 2. Deliverables and Performance Requirements . Protective measures: The KTR must furnish and install all protective measures IAW SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection). .

**Interferences:** The KTR must handle all interferences IAW SFLC Std Spec0000, (Interferences). . Contamination prevention: The KTR must take all precautions to prevent contamination of personnel and spaces IAW all applicable Federal, state, and local regulations. . Fluid handling: The KTR must remove and dispose of removed fluids from the affected piping system, IAW all applicable Federal, state, and local regulations. Do not drain any fluids into any spaced, bilge, or exterior location. .

Piping renewal particulars: The KTR must accomplish the following tasks, using Coast Guard Drawing 225–WLB–528–001, REV K as guidance: o Crop out necessary length of piping (3” & 2” diameter), to include all necessary funnel pieces of the cofferdam system. o Fabricate necessary piping arrangement previously cropped IAW CG Drawing. o Install all fabricated piping to include all required gaskets/seals IAW CG Drawing. o KTR must provide a means of sealing any open piping while any portion of the system is open (i.e.: upstream valve blind flange). . Pipe hangers: Furnish, fit, and install new pipe hangers, as necessary. . Pipe labeling: The KTR must label affected piping as follows:

o Name of the piping system service. o Destination, where feasible. o Direction of flow, indicated by an arrow three inches long pointing away from the lettering. .

**Leak Test:** After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the Contractor must test the affected piping system's operation using the system fluid at normal operating pressure. Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. .

Touch-up preservation: The KTR must prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, (Touch-ups and minor coating repairs.) . Piping insulation installation: The KTR must install new insulation materials over the exposed pipe surfaces at thicknesses appropriate to the application and temperature ranges specified in ASTM F683 Tables.

## Publications

- April 30, 2026: Combined synopsis and solicitation, due May 11, 2026 at 11:00 AM EDT. Notice 6b6676b2d9c540c19a86465f50635c2e. https://sam.gov/workspace/contract/opp/6b6676b2d9c540c19a86465f50635c2e/view

## Points of contact

- Lindsay Mongiovi, lindsay.n.mongiovi@uscg.mil, 5716086752
- Justin Wooldridge, justin.r.wooldridge2@uscg.mil, 2068205327

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/70z08526q0024676.
