Presolicitation
CA NP MOJA 11(2) 10(2) Kelso-Cima and Kelbaker Roads
6982AF26B000001
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
February 14, 2026 at 4:00 PM EST
Closed 216 days ago. Posted January 29, 2026. Scheduled to archive March 1, 2026.
Description
As published on SAM.gov.
THIS IS NOT AN INVITATION FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE.
CA NP MOJA 11(2) 10(2) KELSO-CIMA AND KELBAKER ROADS FULL AND OPEN COMPETITION WITH HUBZone PRICE PREFERENCE PROJECT DETAILS: The Federal Highway Administration, Central Federal Lands Highway Division (FHWA-CFLHD), in coordination with the National Park Service, Mojave National Preserve, is proposing improvements to approximately 56.5 miles of roads within Mojave National Preserve in San Bernardino County, CA to improve safety and visitor access.
Improvements primarily include resurfacing, restoration, and rehabilitation, and work is included on the entire 19.3 miles of Kelso-Cima Road, 22.3 miles of South Kelbaker Road, and 14.9 miles of Morningstar Mine Road.
The Kelso-Cima and South Kelbaker Road improvements consist of full depth reclamation of the existing pavement with placement of new asphalt pavement, increasing the roadway width to a consistent 26 feet, minor horizontal/vertical roadway realignment (reconstruction) in select areas, reinforcing 48 low water crossings (11 on South Kelbaker Road and 37 on Kelso-Cima Road), and improving safety with longitudinal and transverse mumble strips, signing, pavement markings, and paved pullouts.
Low water crossings typically consist of buried concrete barriers with riprap revetment. The Morningstar Mine Road improvements consist of full depth reclamation of the existing pavement and placement of surface-course aggregate. Work also includes realignment of Kelso-Cima Road at the Cima Road/Morningstar Mine Road intersection, The estimated cost for the work is between $80,000,000 and $120,000,000.
The anticipated advertisement date for the project is February 2026 with construction commencement in early/mid 2026. Construction duration is estimated at 24 to 30 months. The work is occurring in a natural resource sensitive area and there are environmental constraints that will affect the construction schedule and type of operations. Great attention to detail will be required in achieving customer satisfaction in areas of road construction, traffic control, visitor relations and timely completion of work. Prior experience on projects of similar magnitude in is required. Principle work items include:
110,000 tons of asphalt concrete pavement, 133,000 tons of roadway aggregate, 81,000 tons of aggregate surface course, 110,000 cubic yards of roadway excavation, 49 miles of full depth reclamation, method 2, 6-inch depth, 17,000 linear feet of concrete barrier (low water crossings), 44 miles of fence, tortoise barrier, 2,400 linear feet of tortoise crossing structure, and 12,000 cubic yards of rip rap
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 29, 2026
Presolicitation, originally sources sought
Due February 14, 2026 at 4:00 PM EST. SAM.gov, notice ebfc31e42a2a4878920ea176b9f3d6a6
Points of contact
- Jorey Demljorey.deml@dot.gov
Also open from this buyer
- NV BL SONV 500(3) Red Rock TrailSources soughtNAICS 237310Las Vegas, NV6982AF26SS00007Closes in 5 daysSep 23
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadPresolicitationNAICS 237310Moab, UT6982AF27B000005Closes in 5 daysSep 23
- AZ BL COLO 7528(1) Burro Creek RoadPresolicitationSmall businessNAICS 237310Kingman, AZ6982AF27B000002Closes in 12 daysSep 30
- ND NP THRO 204(1) Buck Hill RoadPresolicitationNAICS 237310Medora, ND6982AF25B000004Closes in 12 daysSep 30
- CO NP BLCA 10(1) South Rim DriveCombined synopsis and solicitationSmall businessNAICS 237310Montrose, CO6982AF26Q000022Closes in 20 daysOct 8