Presolicitation
HI FLAP CR562(1) Kilauea Point
6982AF24B000021
Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.
Response deadline
October 1, 2024 at 6:00 PM EDT
Closed 717 days ago. Posted September 17, 2024. Scheduled to archive October 10, 2024.
Description
As published on SAM.gov.
THIS IS NOT AN INVITIATION FOR BID, PLANS AND SPECIFICATIONS ARE NOT AVAILABLE PROJECT NUMBER: HI FLAP CR562(1)
PROJECT NAME:
Kilauea Point PROJECT DESCRIPTION: Kilauea Point National Wildlife Refuge (KPNWR) is a 203-acre facility located on the north shore of the Island of Kaua'i. It is part of the Kaua'i National Wildlife Refuge Complex managed by the United States Fish and Wildlife Service.
To keep up with the visitation demands, the KPNWR and the USFWS along with the Federal Highway Administration Central Federal Lands Highway Division is proposing to improve the area by providing better access along Kolo Road and Kilauea Road (Route 562) for pedestrians and bicyclists, as well as improvements to the overlook. The project consists of installation of a sidewalk adjacent the existing roadway from the intersection of Kuhio Highway to the KPNWR Overlook.
Work includes pavement rehabilitation and resurfacing of the existing roadway, with full depth pavement on aggregate base course for roadway widening segments, and reconstruction of the existing turnaround. Guardrail, sidewalk, curb, gutter, two mini-roundabouts, striping, and pedestrian crossings will be provided to establish a safe and accessible corridor for pedestrians and bicyclists. Minor utility adjustments and construction is also anticipated. The total project length is approximately 1.70 miles.
PRINCIPAL WORK ITEMS: 18,500 square yards of Removal of Pavement, Asphalt 3,370 cubic yards of Roadway Excavation 2,900 ton of Roadway Aggregate, Method 2 4,200 ton of Asphalt Concrete pavement, Type 1 630 square yard of minor concrete Pavement, Reinforced 1,540 linear feet of Curb, Concrete, 16-Inch Depth (Slotted) 5,670 square yards of Sidewalk, Concrete 34 Accessibility Ramps, Concrete ANTICIPATED SCHEDULE:
Advertise:
October 2024 Award:
Fall 2024 Construction: December 2024 –December 2025 ESTIMATED COST RANGE: The anticipated cost range is between $10,000,000 and $20,000,000.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 17, 2024
Presolicitation, originally sources sought
Due October 1, 2024 at 6:00 PM EDT. SAM.gov, notice 72ed1dc83df0489bb19c097bcba2c317
Points of contact
- Stephanie Navarrocflcontracts@dot.gov
- Ryan Phillipscflacquisitions@dot.gov
Also open from this buyer
- NV BL SONV 500(3) Red Rock TrailSources soughtNAICS 237310Las Vegas, NV6982AF26SS00007Closes in 5 daysSep 23
- UT NP ARCH 100(2) Bridges on Delicate Arch RoadPresolicitationNAICS 237310Moab, UT6982AF27B000005Closes in 5 daysSep 23
- AZ BL COLO 7528(1) Burro Creek RoadPresolicitationSmall businessNAICS 237310Kingman, AZ6982AF27B000002Closes in 12 daysSep 30
- ND NP THRO 204(1) Buck Hill RoadPresolicitationNAICS 237310Medora, ND6982AF25B000004Closes in 12 daysSep 30
- CO NP BLCA 10(1) South Rim DriveCombined synopsis and solicitationSmall businessNAICS 237310Montrose, CO6982AF26Q000022Closes in 20 daysOct 8