Skip to content
Abierto

Award notice, hubzone set-aside, first published as presolicitation

NM FTBL 2004(2) Wild Rivers Road

6982AF24B000005

Federal Highway Administration, 6982AF Central Federal Lands Divisi. Highway, Street, and Bridge Construction.

Awarded

West Point Contractors, Inc.

$11,603,168.27 obligated so far on USAspending

Description

As published on SAM.gov with the solicitation of May 16, 2025.

PROJECT NUMBER: NM FTBL 2004(2)

PROJECT NAME: Wild Rivers Road Project Location The Wild Rivers BCB is located within the Wild Rivers Recreation Area, a portion of the Rio Grande del Norte National Monument. It begins about 26 miles north of Taos, NM near the town of Cerro, NM, where NM state highway 378 dead-ends into the Byway. The Wild Rivers BCB is a 12.5-mile two-lane paved road that offers access points for recreational biking and mountain biking on 3 designated trails, sightseeing, camping / picnicking, fishing, and hiking on 10 designated trails. The access road is used for school visitations, architectural surveys, geology education services, horseback riding, and fishing tour guides.

SCOPE OF THE WORK: The primary objective of the proposed project is the rehabilitation and reconstruction of 3.21-miles of the Wild Rivers Road section from the Loop Road end, north to the end of Ice Hill and consists of widening the paved surface to 34 feet to provide wider shoulders. Schedule A has a proposed pavement typical section of two 11-foot lanes and two 6-foot shoulders with safety edge and proper shouldering material to the top edge of pavement for 2.81 miles of road.

Option-X consists of 0.4 miles of full reconstruction areas at Ice Hill including reverse curves and realignment with a typical section of two 11-foot lanes and two 6-foot shoulders. The 3-inch asphalt pavement will be placed over 8-inches of aggregate base ENGINEER’S ESTIMATE: The estimated price range of the project work is between $5,000,000 and $10,000,000.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
ZSPHHPTS4D33
CAGE
53WP4
Vendor location
Tucson, AZ
Contract
6982AF25C000025, definitive contract
Obligated
$11,603,168.27
Actions
3 between May 21, 2025 and June 12, 2026
Competition
Full and Open Competition After Exclusion of Sources, 3 offers received
Set-aside reported
Hubzone SET-ASIDE
Described as
NM FTBL 2004(2) Wild Rivers Road the Purpose of This Action Is to Award a Construction Contract
Match
award number 6982AF25C000025 equals the contract number; same awarding office 6982AF (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. February 27, 2025

    Presolicitation, originally sources sought

    Due March 14, 2025 at 4:00 PM EDT. SAM.gov, notice 69e61b934b1945d695afa8bac8589e95

  2. March 31, 2025

    Solicitation, originally presolicitation

    Due May 1, 2025 at 4:00 PM EDT. SAM.gov, notice ec3d226822534a959e0e7bea608609e3

  3. April 11, 2025

    Solicitation

    Due May 1, 2025 at 4:00 PM EDT. SAM.gov, notice 96b06f6adfc34d0ca04ad7038758cb3f

  4. April 23, 2025

    Solicitation

    Due May 1, 2025 at 4:00 PM EDT. SAM.gov, notice 6bcdf9a28a0c46279a1929c574a44542

  5. April 24, 2025

    Solicitation

    Due May 1, 2025 at 4:00 PM EDT. SAM.gov, notice 0187534911bb45879a62ed13a8117810

  6. May 1, 2025

    Solicitation

    Due May 1, 2025 at 4:00 PM EDT. SAM.gov, notice 777e4298993c4fb58d604dfa32c524fd

  7. May 16, 2025

    Solicitation

    Due May 1, 2025 at 4:00 PM EDT. SAM.gov, notice 4b3fc52b76724feab4d7ad121f76e0fb

  8. May 27, 2025

    Award notice, originally solicitation

    Awarded to WEST POINT CONTRACTORS, Inc. Tucson for $8,823,429. SAM.gov, notice 176e7919348e4004b56ee554ae67173a

Points of contact