Skip to content
Abierto

Special notice, total small business set-aside

JAMES REPAIR FEEDBACK CIRCIUT

70Z085Q250011656

US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.

Response deadline

March 7, 2025 at 3:00 PM EST

Closed 560 days ago. Posted March 6, 2025. Scheduled to archive March 7, 2025.

Description

As published on SAM.gov.

THIS IS TO BE AWARDED SOLE SOURCE. TECHNICAL SERVICES TO REPAIR FEEDBACK CIRCIUT IN CONTROLLABLE PITCH PROPELLER (CPP) SYSTEM Background. Cutter is experiencing astern creep at HP 0 in Dual Engine Maneuvering Mode. MCS-5 reports pitch percentages of 1% to 1% when at HP 0, but astern creep is significant enough to require one shaft ahead at HP 2 to maintain longitudinal position alongside pier. Astern creep tendency observed on both shafts via prop wash.

Cutter has new potentiometer in the feedback circuit to remedy but needs the new values adjusted in the CanMan system. Without these adjustments the cutter maneuvering system is severely degraded. They are also experiencing several loss of engine speed control incidents while in Starboard Cruise mode, resulting in severe engine bogging or uncommanded declutches and engine shutdowns.

Issue appears to occur when the operator increases handle position from ~2 to ~5, at which point pitch on both shafts increases as expected but engine RPM/power output does not, causing the engine to bog down to ~240 ERPM at which point the system automatically declutches both shafts and shuts the engine down. Scope. Kongsberg has qualified Tech Rep and has all proprietary data for the key required to adjust the settings in the CanMan system. This is the program the interfaces with Rolls Royce MCMS programming.

INSTALL NEW POTENIOMETER IN THE FEEDBACK CIRCIUT. ALL PARTS ARE ONBOARD THE CUTTER ADJUST NEW NUMERIC VALUES IN THE MCMS/ CANMAN PROGRAMMING. Troubleshoot mapping and adjustments of throttle position compared to CPP system. Tasks. The contractor shall provide technical expertise for renewal or repair of the equipment to normal operation. Delivery. Contractor shall provide a final report within 3 days of contract period of performance.

Place of performance- CGC JAMES Naval Station Norfolk 1530 Gilbert Street Suite 2000 Norfolk, VA 23511 Period of performance- 08 MAR 2025 – 14 MAR 25 Tech can schedule 2 days anytime during POP. Points of Contact. 10.1.

USCG-SFLC-LRE PL Asset Management: CWO Matthew Temple, matthew.temple@uscg.mil, 510-460-8195

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 6, 2025

    Special notice

    Due March 7, 2025 at 3:00 PM EST. SAM.gov, notice 734cff60d5f64c8984eec99f5d76a6ef

Points of contact