Special notice, total small business set-aside
USCGC Fir Aerial, Forklift and Bobcat Training
70Z08525Q0000023
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
July 31, 2025 at 11:00 AM EDT
Closed 414 days ago. Posted July 28, 2025. Scheduled to archive August 15, 2025.
Description
As published on SAM.gov.
Statetment of Work for CGC Fir. This is for informational purposes only this has been awarded VIA Jotfoc SOW FIR Train the Trainer Visit LAST UPDATED: 7/23/2025 PAGE 1/2 Train the Trainer Tech Services USCGC Fi (WLB-213) Yellow Gear Train the Trainer Training for Crew 1. Background, Problem Statement:
1.1 Background: CGC Fir is bringing its Yellow Gear Program up to standard. To do so it will need a third-party trainer to train senior members so that the unit will be able to qualify its own members in equipment to complete CGC Fir’s mission of ATON.
1.2 Problem Statement: 1. Complete training for senior members so that CGC Fir will fall in line with policy.
2 Tasking: 2.1.1 Complete Training of Forklift 2.1.2 Establish safety protocols, daily inspections, and maintenance schedule for the Cutter Forklift. 2.1.3 Train on proper weight handling and loading of sinkers, chain, and buoys. 2.1.4 Complete Training on Man Lift. 2.1.4.1 Establish safety protocols, daily inspections, and maintenance schedule for the Cutter Manlift. 2.1.4.2 Establish safety gear associated with being multiple feet in the air including harnesses, fall arrest, and other PPE.
Set the standard safe practice of how to use associated gear. 2.1.5 Complete Training in Bobcat 2.1.6 Establish safety protocols, daily inspections, and maintenance schedule for the Cutter Bobcat. 2.1.7 Train on proper weight handling and changing of attachments. 2.1.8 Provide written final report of the Tech Rep Visit 2.1.9 Provide final report on the Tech Rep visit.
Include noteworthy findings and discussion on events, documentation of results, and any lesson learned for similar training to other SOW FIR Train the Trainer Visit LAST UPDATED: 7/23/2025 PAGE 2/2 The CTR will travel to and perform work on board CGC Fir 300 North Fill Pier Cordova, AK 99574 4 PERIOD OF PERFORMANCE The period of performance for this contract will be up to 5 days on site 8-hour days period during an agreed upon time.
5 PLACE OF PERFORMANCE & POC’S The primary place of performance will be CGC Fir 300 North Fill Pier Cordova, AK 99574. 5.1 GOVERNMENT FURNISHED RESOURCES Technicians will bring supporting documentation and associated training materials. 5.2 Security Requirement Provide the name of technician to crew prior to arrival and good contact information.
5.3 Point of Contact: Any cutter site visits will be coordinated through the cutter POC.
Cutter POC: CWO Jon Liboy Engineer Officer CGC FIR (WLB 213)
Work Cell:
843-425-2748 Pers Cell:
Email: Jonathan.i.liboy@uscg.mil
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 28, 2025
Special notice
Due July 31, 2025 at 11:00 AM EDT. SAM.gov, notice 1ef8f33cfc984857888b341f0d566160
Points of contact
- Justin Wooldridgejustin.r.wooldridge2@uscg.mil2068205327
- Lindsay Mongiovilindsay.n.mongiovi@uscg.mil5716086752
Also open from this buyer
- CGC OAK WATER TIGHT DOORS, HATCHES, SCUTTLES RENEWALCombined synopsis and solicitationSmall businessNAICS 332321Newport, RI70Z08526Q0027652Closes todaySep 18
- USCGC POLAR STAR MOBILE DTECombined synopsis and solicitationSmall businessNAICS 424720Seattle, WA14501_MOBILE_DTE_FY26Closes tomorrowSep 19
- Heater ElectricSolicitationSmall businessNAICS 333414Maryland70Z08526Q30113B00Closes tomorrowSep 19
- USCGC Stratton Shaft Alignment and Bearing Reaction CheckCombined synopsis and solicitationSmall businessNAICS 811310Alameda, CA70Z08526Q0026058Closes in 3 daysSep 21
- CGC ANVIL QUICK ACTING WATER TIGHT SCUTTLESCombined synopsis and solicitationSmall businessNAICS 336611Charleston, SC70Z08526Q0027390Closes in 3 daysSep 21