Combined synopsis and solicitation
USCGC ALDER MDE INSPECT AND REPAIR
70Z08524P0005503
US Coast Guard, SFLC Procurement Branch 2. Ship Building and Repairing.
Response deadline
June 21, 2024 at 11:00 AM EDT
Closed 818 days ago. Posted June 11, 2024, first published June 11, 2024. Scheduled to archive June 12, 2024.
Description
As published on SAM.gov.
SCOPE OF WORK (SOW) FOR USCGC ALDER (WLB 216) MAIN PROPULSION DIESEL ENGINE (MPDE) TOP END INSPECTION AND REPAIR 1.0 GENERAL 1.1 BACKGROUND The 225’ WLB asset, USCGC ALDER, experienced a mechanical failure of both MPDEs while operating at full power in transit mode resulting in unusual noise, extreme charge air temperatures, exterior paint failure in the vicinity of the intake air chamber, dense black smoke from the exhaust stack, and power reduction.
1.2 SCOPE The Contractor shall provide all personnel, labor, materials, travel, parts, tools, test equipment, test fittings, supplies, consumables, and equipment to accomplish tasking. The Contractor shall provide the services of a qualified Tech Rep familiar with the Caterpillar 3608, to accomplish all tasking. The Tech Rep will be responsible for the following:
• Advise on manufacturer's proprietary information pertinent to the system. • Assist with proper repair methods and ensure compliance with manufacturer's procedures and standards during disassembly, inspection, repair, modification, calibration, and reassembly of the equipment/system. • Ensure compliance with manufacturer's procedures and standards during disassembly, inspection, and reassembly of the shaft seals.
1.2.1 REFERENCES Coast Guard Publications • TP 3518A-233-A, Main Diesel Engine, Model 3608/1 • TP 3518B-233-A, Main Diesel Engine, Model 3608/1 1.3 OBJECTIVE The objective is to inspect all necessary portions of both engines to determine the cause and scope of damage and make recommendation for appropriate repair plan. 1.4 TASKS 1.4.1 Disassembly and inspection (physical or borescope) of top end components necessary to determine cause/scope of damage.
1.4.2 Inspection of exhaust turbo charger (ETC) to determine cause/scope of damage. 1.5 DELIVERY Contractor will provide CFR with findings and recommended repair plan within 2 days of inspection completion. 1.6 SECURITY Base access is required. Contractor will provide names and government issued identification numbers of all workers to cutter representative two business days prior to beginning work. 1.7 PLACE OF PERFORMANCE Coast Guard Sector San Francisco, Yerba Buena Island, San Francisco, CA.
1.8 PERIOD OF PERFORMANCE 15 June 2024 - 25 July, 2024. 1.9 POINTS OF CONTACT USCGC ALDER Engineer Officer: CWO Christopher Laterza, christopher.p.laterza@uscg.mil, 801-390-8106.
USCG-SFLC-IBCT Asset Manager: Daniell Hurtado, daniell.e.hurtado@uscg.mil, 510-290- 8808 Deliver to:
1 Yerba Buena Rd.
San Francisco, CA 94130 POC: CWO Christopher Laterza (218) 297-0000
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- KYLER FISKKYLER.C.FISK@USCG.MIL9492881271
- BRENDEN COXBRENDEN.S.COX@USCG.MIL12068315347
Also open from this buyer
- CGC OAK WATER TIGHT DOORS, HATCHES, SCUTTLES RENEWALCombined synopsis and solicitationSmall businessNAICS 332321Newport, RI70Z08526Q0027652Closes tomorrowSep 18
- USCGC POLAR STAR MOBILE DTECombined synopsis and solicitationSmall businessNAICS 424720Seattle, WA14501_MOBILE_DTE_FY26Closes in 2 daysSep 19
- Heater ElectricSolicitationSmall businessNAICS 333414Maryland70Z08526Q30113B00Closes in 2 daysSep 19
- USCGC Stratton Shaft Alignment and Bearing Reaction CheckCombined synopsis and solicitationSmall businessNAICS 811310Alameda, CA70Z08526Q0026058Closes in 4 daysSep 21
- CGC ANVIL QUICK ACTING WATER TIGHT SCUTTLESCombined synopsis and solicitationSmall businessNAICS 336611Charleston, SC70Z08526Q0027390Closes in 4 daysSep 21