Skip to content
Abierto

Special notice

FY25: Lake Nona Medium Voltage Repair

36C24825Q0885

Department of Veterans Affairs, 248-Network Contract Office 8. Electrical Contractors and Other Wiring Installation Contractors.

Response deadline

June 16, 2025 at 11:00 AM EDT

Closed 458 days ago. Posted June 13, 2025. Scheduled to archive August 15, 2025.

Description

As published on SAM.gov.

The Department of Veteran Affairs, Network Contracting Office 08 invites interested Contractors to attend a site visit for the purpose of assessing the issues identified in the government-generated Trouble Call report. This site visit will assist prospective offers in evaluating the work environment and technical requirements in preparation for submitting a quote under the upcoming Request for Quote (RFQ).

Instructions: Interested parties must pre-register attendees (no more than two) by providing names to Robert.edwards2@va.gov and rohan.mckenzie@va.gov no later than June 16, 2025, 11:00 AM. Please arrive on time and bring proper identification to gain access to the facility.

Site Visit Details:

Date:

June 17, 2025 Time: 10:00 AM (local time)

Location: Orlando VA Medical Center at Lake Nona, 13800 Veterans Way, Orlando, FL 32827 Meeting Point: Inside the lobby near the piano Purpose: Visual inspection and discussion of the issue described in Trouble Call Report Follow-up: Contractor questions will be address on-site and incorporated into the forthcoming RFQ as appropriate.

Background: Emergency (generator) power circuit(s) to the Lake Nona clinic are faulted and/or unreliable. The medium voltage circuit DAG-3 is the emergency (generator) circuit powering the Clinic substation SS-CG2; and is the alternate power source for Clinic substation SS-CG1. It was Hi-Pot tested and the report indicated a catastrophic failure on B-phase, requiring both substations to be placed on the alternate circuit (DAG-15) with no redundancy.

A visual inspection of manholes EA1-1 and EA1-2 in the duct bank series noted splices in them that show signs corrosion and degradation. Troubleshooting, testing was performed on the circuit and damage to the B-phase conductor insulation is suspected to be localized the within the ductwork itself requiring emergent replacement. The medium voltage circuit DAG-15 is the emergency (generator) circuit powering the Clinic substation SS-CG1 and is the alternate power source for Clinic substation SS-CG2.

It was Hi-Pot tested and the report indicated signs of leakage, likely from several splices/phases in the duct bank series manholes. A visual assessment was performed in conjunction with the Hi-Pot test and noted signs of swelling on several splices. Circuit DAG15 is the sole operable emergency (generator) circuit to the Clinic substations SS-CG1/2 (in its current switched state) and in urgent need of replacement and/or repair. The Normal power circuit to the Lake Nona Domiciliary is unreliable.

The medium voltage circuit DAN-2 is the sole normal power circuit powering the Domiciliary substation SS-DG1. It was quickly identified to have sustained a catastrophic splice failure on only C-phase on 12Nov24 in manhole NA2-5. Only C- phase splice was repaired, and the circuit was put back in service in >24hrs. During the visual assessment splices were noted in manholes NA2-5, NA2-6, NA2-7, and NA2-8 with various signs of corrosion and swelling indicative of impending failure.

Circuit DAN-2 requires urgent replacement. DBN-7 Hospital (Normal Power) circuit - A visual assessment confirmed smoke and electrical burning signs from manhole NB2-3 near the golf cart yard of the warehouse. Suspected leaking splice damage. IMG_1005 1.3gp.

Attachments: ATTACHMENT A - Trouble Call Report of the Hi-Pot Cable test DAG-3 ATTACHMENT B - Trouble Call Report of the Hi-Pot Cable test DAG-15 Note: This notice is for informational and planning purposes only. It does not constitute a solicitation or guarantee of future contract award.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 13, 2025

    Special notice

    Due June 16, 2025 at 11:00 AM EDT. SAM.gov, notice e99b7a72f1b4431399cdd8438645d194

Points of contact