Award notice, first published as solicitation
Boundary Clearing at William H Harsha Lake
W912QR24Q0110
Department of the Army, W072 Endist Louisville. Landscaping Services.
Awarded
$9,149.00 obligated so far on USAspending
Description
As published on SAM.gov with the solicitation of August 6, 2024.
The contractor shall furnish all personnel, equipment, supplies and materials necessary to clear the William H Harsha Lake Project Boundary Line. Prices should include mobilization and de-mobilization, fuel, labor, material, and equipment.
The contractor’s work and responsibility shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all work is conducted in accordance with the contract requirements and all applicable Federal, State and Local laws and regulations. All work shall be performed in strict compliance with the attached specifications and all other terms and conditions incorporated herein.
The contractor shall clear a path along the project boundary that is at least four (4) foot wide (can be up to 8ft wide) along the identified segments of land in Exhibit A. All brush must be cleared and all stumps should be flush with the ground. Rubber tracked or tired equipment is allowable. Any soil damage will be repaired after job is complete by contractor with Technical Point of Contact (TPOC) approved grass seed mixture and straw (compostable spikes only for straw blankets) where applicable.
All stumps should be treated with herbicide (by a state licensed applicator) in accordance with the Ohio Environmental Protection Agency (OEPA). Any standing, native tree that is four (4) inches or over in diameter should be left. Any debris from vegetation removal should be left on the U.S. Army Corps of Engineers side and at no point should any vegetation, personnel, or equipment be placed (however temporary) on lands other than William H Harsha Lake project lands.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Ac Enviromental Services LLC
- UEI
- WDAGTGQ2THQ8
- CAGE
- 9NHM4
- Vendor location
- Hillsboro, OH
- Contract
- W912QR24P0086, purchase order
- Obligated
- $9,149.00
- Actions
- 1 between August 22, 2024 and August 22, 2024
- Competition
- Competed Under SAP, 5 offers received
- Set-aside reported
- Small Business Set Aside - Total
- Described as
- Boundary Line - Clearing at Harsha Lake
- Match
- award number W912QR24P0086 equals the contract number; same awarding office W912QR (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
August 5, 2024
Solicitation
Boundary Clearing at William H Harsha Lake - W912QR24Q0110
Due August 19, 2024 at 10:00 AM EDT. SAM.gov, notice e36077f2b42e4fa5bce7f58ba9be53b8
August 6, 2024
Solicitation
Boundary Clearing at William H Harsha Lake - W912QR24Q0110
Due August 19, 2024 at 10:00 AM EDT. SAM.gov, notice 247c143073d945da85fa420c79769887
August 22, 2024
Award notice
Awarded to AC ENVIROMENTAL SERVICES LLC Hillsboro for $9,149. SAM.gov, notice f5909529dabe43d7a18f627db75c43b6
Also open from this buyer
- Nolin River Lake Tailwater Restroom ConstructionCombined synopsis and solicitationSmall businessNAICS 236220KentuckyW912QR26QA110Closes todaySep 18
- C.J. Brown Dam and Reservoir Elevator Modernization - Amendment 01Combined synopsis and solicitationNAICS 333921W912QR26QA101Closes todaySep 18
- Barren River Lake Repair Drainage Ditch at Tailwater Stilling BasinSolicitationNAICS 238910W912QR26QA094Closes todaySep 18
- Renovate Building 1203-DOAS/AHU and Fire Suppression Water System, March Air Reserve Base, CaliforniaPresolicitationSmall businessNAICS 236220CaliforniaW912QR27BA001Closes tomorrowSep 19
- Green River Lake- Floating Courtesy DockSolicitationSmall businessNAICS 237990W912QR26QA108Closes in 3 daysSep 21