Solicitation
First Article ESR 591 Single Cell Cavity
RFP-JSA-24-R422091
Department of Energy, Jefferson Lab - DOE Contractor. All Other Fabricated Metal Product Manufacturing.
Response deadline
September 6, 2024 at 5:00 PM EDT
Closed 741 days ago. Posted July 19, 2024. Scheduled to archive September 6, 2024.
Description
As published on SAM.gov.
The EIC Project is a new particle accelerator being installed at Brookhaven National Laboratory. Thomas Jefferson National Accelerator Facility (TJNAF) is providing twenty-four (24) new 591 MHz single-cell cavities to the EIC Project. Seventeen (17) of these cavities will be used in the new EIC Electron Storage Ring (ESR), five (5) will be used in the new EIC Hadron Storage Ring (HSR), one (1) will be used to assemble a spare cryomodule cold-mass, and one (1) is a Risk mitigation spare. In both the ESR and HSR these cavities will operate at 591 MHz, 4.0 MV, and 2.0 K, while coupling up to 800 kW of power to multi-ampere beams.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 19, 2024
Solicitation
Due September 6, 2024 at 5:00 PM EDT. SAM.gov, notice c44738389d7348339491fd53c608368f
Points of contact
- Connor Clarkcclark@jlab.org7572697955
Also open from this buyer
- Cryo SNS Cold Box Shell AnalysisSolicitationSmall businessNAICS 541330VirginiaSURATech-26-455678Closes in 14 daysOct 1
- Purified Helium Gas - BulkSolicitationNAICS 325120Newport News, VASURATech-26-R456384Closes in 14 daysOct 1
- Dilution Refrigerator with a Superconducting SolenoidSolicitationNAICS 334516Newport News, VAStek-26-R448871Closes in 29 daysOct 16