First Article ESR 591 Single Cell Cavity

RFP-JSA-24-R422091

Department of Energy, Jefferson Lab - DOE Contractor. All Other Fabricated Metal Product Manufacturing.

Response deadline

September 6, 2024 at 5:00 PM EDT

Closed 741 days ago. Posted July 19, 2024. Scheduled to archive September 6, 2024.

Description

As published on SAM.gov.

The EIC Project is a new particle accelerator being installed at Brookhaven National Laboratory. Thomas Jefferson National Accelerator Facility (TJNAF) is providing twenty-four (24) new 591 MHz single-cell cavities to the EIC Project. Seventeen (17) of these cavities will be used in the new EIC Electron Storage Ring (ESR), five (5) will be used in the new EIC Hadron Storage Ring (HSR), one (1) will be used to assemble a spare cryomodule cold-mass, and one (1) is a Risk mitigation spare. In both the ESR and HSR these cavities will operate at 591 MHz, 4.0 MV, and 2.0 K, while coupling up to 800 kW of power to multi-ampere beams.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 19, 2024

    Solicitation

    Due September 6, 2024 at 5:00 PM EDT. SAM.gov, notice c44738389d7348339491fd53c608368f