# First Article ESR 591 Single Cell Cavity

Canonical: https://abierto.us/opportunities/rfpjsa24r422091

- Solicitation number: RFP-JSA-24-R422091
- Notice type: Solicitation
- Status: Closed. Deadline was September 6, 2024 at 5:00 PM EDT
- Department: Department of Energy
- Contracting office: Jefferson Lab - DOE Contractor (899041)
- NAICS: 33299 All Other Fabricated Metal Product Manufacturing
- Product or service code: 3685 Specialized Metal Container Manufacturing Machinery and Related Equipment
- Place of performance: Newport News, Virginia
- County: City of Newport News (FIPS 51700). https://abierto.us/counties/city-of-newport-news-va-51700
- City: Newport News. https://abierto.us/cities/newport-news-va-5156000
- First posted: July 19, 2024
- Last posted: July 19, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/c44738389d7348339491fd53c608368f/view

## Description

The EIC Project is a new particle accelerator being installed at Brookhaven National Laboratory. Thomas Jefferson National Accelerator Facility (TJNAF) is providing twenty-four (24) new 591 MHz single-cell cavities to the EIC Project. Seventeen (17) of these cavities will be used in the new EIC Electron Storage Ring (ESR), five (5) will be used in the new EIC Hadron Storage Ring (HSR), one (1) will be used to assemble a spare cryomodule cold-mass, and one (1) is a Risk mitigation spare. In both the ESR and HSR these cavities will operate at 591 MHz, 4.0 MV, and 2.0 K, while coupling up to 800 kW of power to multi-ampere beams.

## Publications

- July 19, 2024: Solicitation, due September 6, 2024 at 5:00 PM EDT. Notice c44738389d7348339491fd53c608368f. https://sam.gov/workspace/contract/opp/c44738389d7348339491fd53c608368f/view

## Points of contact

- Connor Clark, cclark@jlab.org, 7572697955

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/rfpjsa24r422091.
