Skip to content
Abierto

Solicitation, local area set-aside

Design Bid Build Demolish Building 85 - Naval Station Newport , Newport, RI

N4008524R1260

Department of the Navy, Navfacsyscom Mid-Atlantic. Commercial and Institutional Building Construction.

Response deadline

February 9, 2024 at 10:00 AM EST

Closed 952 days ago. Posted January 8, 2024, first published January 8, 2024. Scheduled to archive February 24, 2024.

Description

As published on SAM.gov.

THIS ACTION IS RESERVED FOR DESIGN-BUILD (DB)/DESIGN-BID-BUILD (DBB), INDEFINITE DELIVERY/INDEFINITE QUANTITY (IDIQ) MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC) (CONTRACT NUMBERS N4008521D0052, N4008521D0053, N4008521D0054, N4008521D0055, N4008521D0056, N4008521D0057, N4008521D0066) FOR FACILITIES IN THE NORTH AREA OF RESPONSIBILITY (AOR) TO INCLUDE CONNECTICUT, DELAWARE, MAINE, MASSACHUSETTS, NEW HAMPSHIRE, NEW JERSEY, NEW YORK, PENNSYLVANIA, RHODE ISLAND, AND VERMONT N4008521D0052 - Benaka Inc. N4008521D0053 - CCI Utility and Construction Services, LLC N4008521D0054 - Kunj Construction Corporation N4008521D0055 - Ocean Construction Services N4008521D0056 - PEM-Harkins Joint Venture N4008521D0057 - Tantara Corporation N4008521D0066 - J&J Contractors, Inc. The Work consists of the complete demolition and removal of a single concrete framed two-story structure of approximately 17,800 total gross Sq.

Ft. and all as-found interior structural / mechanical / electrical appurtenances. The structure is defined as a Building Shell, having undergone both NAVFAC decommissioning in 2008 and currently holds select HAZMAT certifications. However, as found, hazardous material testing and remediation is required prior to demolition. The Contractor is to perform ACM testing as a Contractor's cost and dispose per regulations prior to demolition work.

Historically, the structure was constructed in 1913 as a storage facility (concrete and multi-wythe exterior wall construction). Existing Level 1 finish floor is elevated above grade approximately 3 Ft. 6 In. above mean grade. The structure did receive entry/egress improvements in 1981 (Stair tower and vestibule entries). Complete demolition is to include the following and incidental related work. This list is not a comprehensive summary of all demolition responsibilities of the contractor.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. January 8, 2024

    Solicitation

    Due February 9, 2024 at 10:00 AM EST. SAM.gov, notice 3304049e151e4500b15f221796254565

  2. January 8, 2024

    Solicitation

    Due February 9, 2024 at 10:00 AM EST. SAM.gov, notice f64befc23b2d411a9127e722adad0950

Points of contact