Presolicitation
MV-22 INSTALLATIONS
N00019-25-RFPREQ-APM275-0536
Department of the Navy, Naval Air Systems Command. Other Aircraft Parts and Auxiliary Equipment Manufacturing.
Response deadline
August 1, 2025 at 4:00 PM EDT
Closed 413 days ago. Posted July 17, 2025. Scheduled to archive August 16, 2025.
Description
As published on SAM.gov.
Naval Air Systems Command, V-22 Joint Program Office, PMA-275 intends to negotiate and issue a Delivery Order under Basic Ordering Agreement N0001922G0002 to Bell Boeing (BB) Joint Project Office (JPO) on a sole-source basis for follow-on installations of MV-22 Engineering Change Proposals (OCONUS and CONUS).
These installations will be performed together as part of a modification sequencing, which leverages BB JPO’s unique and proprietary knowledge as the MV-22 Original Equipment Manufacturer and the developer of these specific, interdependent Engineering Change Proposals.
This integrated approach is critical for ensuring seamless system integration, maintaining configuration control, and mitigating the substantial risks associated with fragmented efforts, thereby guaranteeing the timely and effective operational readiness of the MV-22 fleet. This will be a five (5) year Delivery Order with a base year and four (4) option years.
The planned award date is November of 2026. This action is being awarded on a sole source basis to the BB JPO in accordance with the statutory authority permitting other than full and open competition under Title 10 U.S.C. 3204(a)(1), as implemented by FAR Part 6.302-1, "Only one responsible source and no other supplies or services will satisfy agency requirements."
BB JPO is the sole designer, developer, and producer of the V-22 Tiltrotor aircraft and is the only known source that possesses the requisite knowledge and expertise required to perform this effort. The base non-recurring engineering efforts, along with the initial installation efforts have already been contracted to BB JPO. Also, BB JPO is the only source that possesses the totality of engineering and technical data required to perform these efforts.
Interested persons may identify their interest and capability to respond to the requirement. This notice of intent is not a request for competitive proposals. However, any capability statements received within fifteen (15) days after the date of publication of this synopsis will be considered by the Government. A determination by the Government not to compete this proposed contract based upon responses to this notice is solely within the discretion of the Government.
Information received will normally be considered solely for the purpose of determining whether to conduct a competitive procurement. For possible subcontracting opportunities, please contact BB JPO.
Boeing: jennifer.m.mckeon@boeing.com
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
July 17, 2025
Presolicitation
Due August 1, 2025 at 4:00 PM EDT. SAM.gov, notice 9e134aa9717547e3ab60a3d0dc21d850
Points of contact
- Karamie L. Plattkaramie.l.platt.civ@us.navy.mil
- Candice Andersoncandice.l.anderson6.civ@us.navy.mil
Also open from this buyer
- MTSS Voltage Regulator WaferPresolicitationNAICS 336413Amarillo, TXN00019-26-RFPREQ-APM275-0203Closes todaySep 18
- V-22 Common Carriage SolutionPresolicitationNAICS 336413N00019-26-RFPREQ-APM275-0759Closes todaySep 18
- Request for Information (RFI) for Navy Collaborative Combat Aircraft Increment 1 Prototype ProjectSources soughtNAICS 336411MarylandN00019-27-RFI-PMA228-CCACloses todaySep 18
- Strike ALQ-214/Country 1 Test Asset Sustainment and RepairsPresolicitationNAICS 334511Clifton, NJN00019-26-SIMAQ-TPM272-0247Closes in 3 daysSep 21
- BQM-34S Subsonic Aerial Target (SSAT) System Advance ProcurementPresolicitationNAICS 336414San Diego, CAN00019-27-RFPREQ-WPM208-0039Closes in 6 daysSep 24