Skip to content
Abierto

Sources sought

PWPS-M RFI

M67854-25-I-5012

Department of the Navy, Commander. Commercial and Service Industry Machinery Manufacturing.

Response deadline

April 14, 2025 at 10:00 AM EDT

Closed 522 days ago. Posted March 13, 2025. Scheduled to archive April 29, 2025.

Description

As published on SAM.gov.

Program Manager, Engineer Systems, Marine Corps Systems Command (MARCORSYSCOM) is conducting market research for the potential sources of a Platoon Water Purification System-Mobile (PWPS-M) as a replacement to current Portable Water Purification System (PWPS). The PWPS is extensively utilized for platoon water purification support within the Fleet Marine Forces.

This system currently comprises two Pelican cases: one housing the purification unit capable of processing 15 gallons of water per hour, and the other containing Stock List-3 (SL-3) equipment. The PWPS is designed to meet the water needs of a platoon-sized unit. We envision the PWPS-M to enhance mobility by consolidating the system into a single Pelican case or equivalent ruggedized, hard-sided, impact resistant polymer transit case.

Our goal is to create a more compact design that allows one Marine to easily transport, lift, and operate the system independently. The PWPS will be capable of providing potable water from fresh, brackish, and saltwater sources to support platoon operations.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 13, 2025

    Sources sought

    Due April 14, 2025 at 10:00 AM EDT. SAM.gov, notice f7103cf59732471e93f0b2fe119b9be6

Points of contact