Department of the Air Force, FA4600 55 Cons PKP. Totalizing Fluid Meter and Counting Device Manufacturing.

Response deadline

May 18, 2026 at 12:00 PM EDT

Closed 123 days ago. Posted May 8, 2026, first published April 27, 2026. Scheduled to archive June 2, 2026.

Description

As published on SAM.gov.

Amendment 0002 - The purpose of this amendment is to add an additional Question and Answer document, and to add multiple photos, diagrams, and schematics. The Statement of Need has been revised to include the additional work of adding the replacement of four (4) valves to the scope of work. Because of the addition of new work, the responses due date has been adjusted to 18 May 2026 at 11:00 AM CT. Finally, the clauses 52.222-41 and 52.222-42 have been added as this contract falls under the Service Contract Act labor standards.

Amendment 0001 - The purpose of this amendment is to add the clause RFO 52.222-90 Addressing DEI Discrimination by Federal Contractors in accordance with recent Executive Order updates. THIS IS A RE-SOLICITATION OF FA460026Q0024. The reason for this re-solicitation is to provide more time for site visit, quote submission, and clarification on specifications. OVERVIEW Offutt Fire and Emergency Services is seeking to purchase and have installed a non-resettable flow meter, with the ability to be calibrated, at the Fire Department Training Grounds. Additionally, the contractor shall replace four (4) valves within the propane system.

Requirements: a. Non-resettable b. Totalizer c. Fits on 2 ½” Schedule 40 Pipe d. Ability to be Calibrated e. Calibration materials (if user can calibrate) f. Compatible with liquid propane g. Rated for use in hazardous areas h. Rated for continual outside use Scope of work:

a. Work shall include the installation of the flow meter on the distribution line from the propane tank to the fire department aircraft training tower.

b. Work shall include replacement of 4 valves withing the propane system on the distribution side. i. Includes transferring propane from storage tank ii. Includes holding propane until work is complete iii. Includes transferring propane back to storage tank once work is complete.

c. All electrical hookups that are required for a fully functioning flow meter.

d. Contractor shall provide all available tools, materials, equipment, permits, and necessary, but unlisted items to perform the installation of the flow meter. INSTRUCTIONS Submit Entry Authority Listing (attached) if site visit is needed by Monday, 4 May 2026 at 11:00 AM CST. Site Visit (if needed) will be Wednesday, 6 May 2026 at 09:00 AM CST. Questions for solicitation are due on or before Thursday, 7 May 2026 at 11:00 AM CST. Answers to questions will be provided by Friday, 8 May 2026 at 11:00 AM CST.

Quote Submissions: Quotes are due no later than Wednesday, 18 May 2026 at 11:00 AMCST. Quotes will be submitted by email to TSgt Jennifer Prestridge (jennifer.prestridge.1@us.af.mil) and Daniel Kuchar (daniel.kuchar@us.af.mil). Offerors are responsible for verifying receipt of their quotes to this office before offer due date and time. See full solicitaiton document and attachments for full scope of requirement.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. April 27, 2026

    Solicitation

    Due May 13, 2026 at 12:00 PM EDT. SAM.gov, notice 1f385d3a4d7a4822a60a00012f7b0d48

  2. April 30, 2026

    Solicitation

    Due May 13, 2026 at 12:00 PM EDT. SAM.gov, notice 0db12ada76e847d2b39a5fe427ffebf4

  3. May 8, 2026

    Solicitation

    Due May 18, 2026 at 12:00 PM EDT. SAM.gov, notice b8c92a2b01c64c2f9527bc888ae8f373