Skip to content
Abierto

Sources sought, total small business set-aside

Building 518--Power Generator Plant Maintenance

FA460025S9999

Department of the Air Force, FA4600 55 Cons PKP. Facilities Support Services.

Response deadline

September 15, 2025 at 12:00 PM EDT

Closed 368 days ago. Posted August 13, 2025. Scheduled to archive September 30, 2025.

Description

As published on SAM.gov.

This sources sought notice is for market research purposes only. No contract award will be made based upon any response to this notice. SCOPE OVERVIEW The Contractor shall provide all personnel, equipment, tools, vehicles, materials, supervision, and other items and services necessary to operate, maintain, and repair the electric generating plant (B518) at Offutt Air Force Base (AFB), NE.

The Contractor shall operate, maintain, install, refuel, and repair energized and de-energized facility and power distribution components for electric circuits, electric control systems, and associated equipment. The Contractor shall maintain, repair, and replace all electric generating plants, electrical systems, facilities, and spaces. Please review the attached draft Performance Work Statement (PWS) for an estimated requirement scope.

The actual scope of the requirement may increase or decrease prior to contract award. SET-ASIDE The government anticipates a 100% Total Small Business set-aside for this requirement. Information is requested from interested parties regarding their small business status and socio-economic categories to help determine the set-aside for the acquisition. INSTRUCTIONS Interested parties shall submit a response to this sources sought showing the following:

Interest Interested parties shall submit a brief statement showing their interest in a potential future contract of a similar nature and scope. Capability Interested parties shall submit a relevant capability statement or narrative showing they have capabilities to perform a contract of this scope Past Performance Interested parties shall submit 2-3 examples of past performance. These past performance examples shall be of a similar size, scope, and complexity.

Experience in other State, Local, or Federal government buildings is preferred. Interested parties may send a general company capability statement with past performance examples to satisfy this requirement.

Questions and Feedback Interested parties may submit questions regarding the requirement and/or industry feedback on the contents of the draft PWS Interested parties shall submit a response to this sources sought notice via email to Mr. Daniel Kuchar (daniel.kuchar@us.af.mil), Mr. Tyler Imhoff (tyler.imhoff.1@us.af.mil), and Mr. Casey Hupton (casey.hupton.1@us.af.mil) no later than 15 September 2025 at 11:00 AM CST.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 13, 2025

    Sources sought

    Due September 15, 2025 at 12:00 PM EDT. SAM.gov, notice 2ef639bf10c64cd4aee89f6c88befd89

Points of contact