Skip to content
Abierto

Sources sought

C-5 Honeycomb Contract Strategy

C-5-Honeycomb-Contract-Strategy

Department of the Air Force, F3yccf 448 SCMW.

Response deadline

March 26, 2026 at 1:00 AM EDT

Closed 174 days ago. Posted March 4, 2026. Scheduled to archive March 26, 2028.

Description

As published on SAM.gov.

The C-5 Galaxy aircraft relies on varius adhesive bonded honeycomb panels to provide aerodynamic contours and adds structural integrity to airframes. Manufacturing bonded panels requires strict control in facility contamination levels, building temperature/humidity, tracking adhesive life, autoclave operation and bond line surface preparations. C-5 bonded panel manufacturing follows detailed processing specifications, and in the case of highly contoured areas, requires an experienced technical staff to interpret aircraft loft data.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 4, 2026

    Sources sought

    Due March 26, 2026 at 1:00 AM EDT. SAM.gov, notice 521b866a47e04cf6902f0dd5bf7cf0a4

Points of contact