Description
As published on SAM.gov.
1. JUSTIFICATION FOR ESTABLISHING A QUALIFICATION REQUIREMENT a. Criticality: Production of this Trailing Edge, Aircraft requires engineering source approval by the engineering support activity 416 SCMS/GUEAA in order to maintain the quality of the part.
Failure to procure this Trailing Edge, Aircraft from a fully qualified source can result in structural or functional deficiencies that will degrade the mission capability of the F-16 Aircraft. b. Complexity, Manufacturing Processes, and/or Material Considerations: Inadequate control of characteristics associated with machining and processing of this Trailing Edge, Aircraft can result in product structural or durability degradation. Close tolerance matching of components is required.
Special care and attention is required for surface finish, assembly, and sealing of this Trailing Edge, Aircraft to assure compliance with specified acceptance test requirements. c. Form, Fit, Function, and Interface: The qualification requirements specified herein are necessary to verify the structural and/or functional integrity and/or fit, form, and interface of the Trailing Edge, Aircraft being procured.
2. REASON WHY QUALIFICATION REQUIREMENT MUST BE DEMONSTRATED PRIOR TO ANY CONTRACT AWARD a. Completion of the specified pre-contract award qualification requirements are necessary to assure the government that the offeror is capable of producing the Trailing Edge, Aircraft in compliance with the applicable technical specification/data within the schedule and economic constraints of our contracts.
There are significant technical and schedule risks which can only be minimized by a completion of the requirements prior to contract award. b. Qualification Requirement Cost Estimate: Estimated likely costs for testing and evaluation, which will be incurred by the potential offering party to become qualified: $4000. c. Qualification Time Completion Estimate: It is the estimate of the engineering support activity that completion of this qualification effort should require 180 days. This is based on complexity of the Trailing Edge, Aircraft and other factors.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
March 13, 2025
Sources sought
Due December 1, 2026 at 12:00 AM EST. SAM.gov, notice 74a6c998d2c341a28fe202c710db95ff
Points of contact
- Tracey Beringertracey.beringer@us.af.mil777-2211
Also open from this buyer
- Requirements Projections On the Web (RPOW) FALL 2025Sources soughtOklahomaSASPO-Products-(RPOW)-FALL-2025Closes in 74 daysDec 1
- Hill Industry Day Quad ChartsSources soughtOklahomaHILL-ID-QUAD-CHARTSCloses in 120 daysJan 16, 2027
- Spring 2026 RPOW ListsSources soughtOklahomaSpring-2026-RPOW-ListsCloses in 316 daysJul 31, 2027
- F-16 Radar Antenna Phase Shift Driver Unit NSN: 1270-01-561-6088 PN: 562R218H01Sources soughtOklahomaNSN_1270015616088_PN_562R218H01Closes in 377 daysSep 30, 2027
- 848th JQR-RQR Master ListSources soughtOklahoma848th-JQR-RQR-Master-ListCloses in 574 daysApr 14, 2028