Solicitation
ANTI-SWEAT INSULATION REMOVAL AND REPLACEMENT (CGC RESOLUTE)
70Z080SSNINSULATION
US Coast Guard, SFLC Procurement Branch 1. Drywall and Insulation Contractors.
Response deadline
September 23, 2024 at 9:00 AM EDT
Closed 725 days ago. Posted September 18, 2024, first published September 2, 2024. Scheduled to archive November 1, 2024.
Description
As published on SAM.gov.
ANIT-SWEAT INSULATION REMOVAL AND REPLACEMENT FOR CGC RESOLUTE.
5.2 Detailed Tasks: 5.2.1 The contractor shall remove and dispose of existing insulation in select areas. 5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60? 5.2.3 Valves?
Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing 5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized. 5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.
5.2 Detailed Tasks: 5.2.1 The contractor shall remove and dispose of existing insulation in select areas. 5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60? 5.2.3 Valves?
Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing 5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized. 5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
Points of contact
- Malicia Smithmalicia.c.smith@uscg.mil7275021555
- JOSEPH RIZZARDIJOSEPH.A.RIZZARDI@USCG.MIL7275021555
Also open from this buyer
- CGC RESOLUTE BRAND NAME DUPLEX STRAINERSCombined synopsis and solicitationSmall businessNAICS 333998Portsmouth, VA52000QR260028133Closes todaySep 18
- CGC BEAR FUEL TANK CLEANINGCombined synopsis and solicitationSmall businessNAICS 336611Portsmouth, VA52000QR260028624Closes todaySep 18
- TURBOCHARGER EXHAUST LEFTCombined synopsis and solicitationNAICS 81131070Z08026QDL062Closes todaySep 18
- SENSOR, PRESSURECombined synopsis and solicitationNAICS 33361270Z08026QDE037Closes todaySep 18
- 52000QR260028665- CGC Vincent Danz Dive ServicesCombined synopsis and solicitationSmall businessNAICS 336611Guam52000QR260028665Closes todaySep 18