# ANTI-SWEAT INSULATION REMOVAL AND REPLACEMENT (CGC RESOLUTE)

Canonical: https://abierto.us/opportunities/70z080ssninsulation

- Solicitation number: 70Z080SSNINSULATION
- Notice type: Solicitation
- Status: Closed. Deadline was September 23, 2024 at 9:00 AM EDT
- Department: Department of Homeland Security
- Agency: US Coast Guard
- Contracting office: SFLC Procurement Branch 1 (70Z080)
- NAICS: 238310 Drywall and Insulation Contractors
- Product or service code: 5640 Wallboard, Building Paper, and Thermal Insulation Materials
- Place of performance: Saint Petersburg, Florida
- County: Pinellas County (FIPS 12103). https://abierto.us/counties/pinellas-county-fl-12103
- City: St. Petersburg. https://abierto.us/cities/st-petersburg-fl-1263000
- First posted: September 2, 2024
- Last posted: September 18, 2024
- SAM.gov: https://sam.gov/workspace/contract/opp/71c0f9796a6d4cbc8bf9c2289981bcc5/view

## Description

ANIT-SWEAT INSULATION REMOVAL AND REPLACEMENT FOR CGC RESOLUTE.

**5.2 Detailed Tasks:** 5.2.1 The contractor shall remove and dispose of existing insulation in select areas. 5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60? 5.2.3 Valves?

Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing 5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized. 5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.

**5.2 Detailed Tasks:** 5.2.1 The contractor shall remove and dispose of existing insulation in select areas. 5.2.2 Install approx. 680 feet of new insulation around select chill water and other lines ranging from ½” – 4” in diameter in accordance with the publications listed in section 7 of this document. Insulation should be rated to minimize heat transfer over a 60? 5.2.3 Valves?

Approx 20 CHW alone temperature differential with no condensation on the piping or exterior / interior of the insulation material.that may need replacing 5.2.4 Treat approx. 770 square feet of interior compartment vertical bulkheads to prevent all sweating in accordance with the publications in section 7. Bulkheads separating compartments with large temperature differences will be prioritized. 5.2.5 Replace and properly insulate approx. 20 linear feet of ducting that has corroded due to condensation.

## Publications

- September 2, 2024: Solicitation, due October 20, 2024 at 9:00 AM EDT. Notice 94c85d787b554e268c3714c6c5e0c289. https://sam.gov/workspace/contract/opp/94c85d787b554e268c3714c6c5e0c289/view
- September 18, 2024: Solicitation, due September 23, 2024 at 9:00 AM EDT. Notice 71c0f9796a6d4cbc8bf9c2289981bcc5. https://sam.gov/workspace/contract/opp/71c0f9796a6d4cbc8bf9c2289981bcc5/view

## Points of contact

- Malicia Smith, malicia.c.smith@uscg.mil, 7275021555
- JOSEPH RIZZARDI, JOSEPH.A.RIZZARDI@USCG.MIL, 7275021555

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/70z080ssninsulation.
