Solicitation
Benchtop Jacketed Laboratory Reactor System
6-B185-Q-00433-00
Department of Energy, Argonne Natl Lab - DOE Contractor. Analytical Laboratory Instrument Manufacturing.
Response deadline
September 11, 2026 at 4:00 PM EDT
Closed 5 days ago. Posted September 8, 2026. Scheduled to archive September 26, 2026.
Description
As published on SAM.gov.
*THIS RFQ WILL BE EVALUATED BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE METHODOLOGY*
Looking to source the same or similar benchtop jacketed laboratory reactor system with the following requirements:
Line Item 1: Reactor‑Ready Mini Starter
Minimum Technical Requirements:
- Modular benchtop reactor platform compatible with Reactor‑Ready Mini vessels
- Must support semi‑automated control through integration with digital controllers (e.g., AVA Pad)
- Chemical‑resistant construction suitable for laboratory use
- Must allow rapid vessel exchange and secure stirring assembly
Line Item 2: 250 mL Single Jacketed Mini Vessel Kit
Minimum Technical Requirements:
- 250 mL vessel capacity with single jacket for precise thermal control
- Compatible with Reactor‑Ready Mini system
- Must support automated or semi‑automated heating/cooling via external circulator
- Borosilicate or chemically resistant glass/jacket materials
Line Item 3: RS20 Control Mini Overhead Stirrer (US Plug)
Minimum Technical Requirements:
- Electronic overhead stirrer suitable for mini‑scale reactors
- Must provide digital speed control for semi‑automated operation
- US‑compatible electrical plug
- Capable of handling viscosities typical for research‑grade reactions
Line Item 4: AVA Pad Reactor Controller (US Plug)
Minimum Technical Requirements:
- Integrated reactor control system enabling semi‑automated operation of stirring, temperature, and process steps
- Touchpad interface for programming reaction parameters
- Must support automation of reaction profiles and data logging
- US‑compatible electrical plug
Line Item 5: M16x1 Insulated Hose, 150 cm
Minimum Technical Requirements:
- Hose length of 150 cm minimum for connection between vessel jacket and circulator
- M16x1 connector type
- Insulated to maintain thermal efficiency during semi‑automated temperature control
- Minimum 2 units required
Line Item 6: M16 PEEK Vessel Side Arm Connectors
Minimum Technical Requirements:
- Connector constructed from PEEK material for high chemical resistance
- Must fit M16 side‑arm ports on Reactor‑Ready vessels
- Supports automated fluid transfer and jacket circulation
Line Item 7: CC‑K6 with Pilot One, 4.5 L, 110–120 V
Minimum Technical Requirements:
- Heating/cooling circulator with 4.5 L capacity and 110–120 V power compatibility
- Must integrate with Reactor‑Ready Mini vessels for automated or semi‑automated temperature control
- Pilot One controller interface with programmable temperature profiles
- Stable, precise temperature regulation suitable for research‑grade reactions
Line Item 8: E‑Grade Professional
Minimum Technical Requirements:
- Software or accessory enabling enhanced automation and process control features
- Must support semi‑automated workflows
- Provides professional‑grade user interface and data functionality
Line Item 9: Connection Cable
Minimum Technical Requirements:
- Supports integrated/semi‑automated operation of controller and reactor components
- Durable insulation and lab‑safe materials
Line Item 10: Condenser Jacket Coil – Rodaviss B19 + GL14 + Fittings
Minimum Technical Requirements:
- Jacketed condenser coil compatible with Reactor‑Ready Mini system vessels
- Rodaviss B19 joint, GL14 fittings included
- Must support semi‑automated condensation and thermal control when paired with circulator
- Chemical‑resistant materials suitable for research‑grade reactions
Please review all applicable documentation and provide a proposal response no later than 3:00 PM CST September 11, 2026.
Within your proposal, please include a fully executed copy of the ANL-70 Request for Quotation, the ANL-70A Reps & Certs, and the country of origin.
Any questions can be directed to the Contracting Officer.
Thank you in advance for your participation.
Attachments
Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.
- Appendix A-71COM-22-OCT-2025.PDF1.0 MB, September 8, 2026
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
September 8, 2026
Solicitation
Due September 11, 2026 at 4:00 PM EDT. SAM.gov, notice 44a14a8ac94f4e728690a210711c3256
1 revisions on SAM
- September 8, 2026: publish, solicitation
Points of contact
- Laura SanchezsanchezL@anl.gov6302521621
Also open from this buyer
- Linear Encoder System ComponentsSolicitationNAICS 334513Illinois6-B141-Q-00444-00Closes tomorrowSep 17
- HVAC System Repairs & Services (SGP Site - Billings, OK)SolicitationNAICS 811310Oklahoma6-B187-Q-00445-00Closes in 6 daysSep 22
- Streak CameraSolicitationNAICS 334516Illinois6-S176-Q-00443-00Closes in 6 daysSep 22
- Chain Reaction Innovations - Energy Technology InnovationSolicitationNAICS 54171Illinois6-BB47-P-00203-00Closes in 44 daysOct 30