# Benchtop Jacketed Laboratory Reactor System

Canonical: https://abierto.us/opportunities/6b185q0043300

- Solicitation number: 6-B185-Q-00433-00
- Notice type: Solicitation
- Status: Closed. Deadline was September 11, 2026 at 4:00 PM EDT
- Department: Department of Energy
- Contracting office: Argonne Natl Lab - DOE Contractor (899031)
- NAICS: 334516 Analytical Laboratory Instrument Manufacturing
- Product or service code: 6640 Laboratory Equipment and Supplies
- Place of performance: Lemont, Illinois
- County: Cook County (FIPS 17031). https://abierto.us/counties/cook-county-il-17031
- City: Lemont. https://abierto.us/cities/lemont-il-1742795
- First posted: September 8, 2026
- Last posted: September 8, 2026
- SAM.gov: https://sam.gov/workspace/contract/opp/44a14a8ac94f4e728690a210711c3256/view

## Description

*THIS RFQ WILL BE EVALUATED BASED ON LOWEST PRICE, TECHNICALLY ACCEPTABLE METHODOLOGY*

Looking to source the same or similar benchtop jacketed laboratory reactor system with the following requirements:

Line Item 1: Reactor‑Ready Mini Starter

Minimum Technical Requirements:

	Modular benchtop reactor platform compatible with Reactor‑Ready Mini vessels

	Must support semi‑automated control through integration with digital controllers (e.g., AVA Pad)

	Chemical‑resistant construction suitable for laboratory use

	Must allow rapid vessel exchange and secure stirring assembly

Line Item 2: 250 mL Single Jacketed Mini Vessel Kit

Minimum Technical Requirements:

	250 mL vessel capacity with single jacket for precise thermal control

	Compatible with Reactor‑Ready Mini system

	Must support automated or semi‑automated heating/cooling via external circulator

	Borosilicate or chemically resistant glass/jacket materials

Line Item 3: RS20 Control Mini Overhead Stirrer (US Plug)

Minimum Technical Requirements:

	Electronic overhead stirrer suitable for mini‑scale reactors

	Must provide digital speed control for semi‑automated operation

	US‑compatible electrical plug

	Capable of handling viscosities typical for research‑grade reactions

Line Item 4: AVA Pad Reactor Controller (US Plug)

Minimum Technical Requirements:

	Integrated reactor control system enabling semi‑automated operation of stirring, temperature, and process steps

	Touchpad interface for programming reaction parameters

	Must support automation of reaction profiles and data logging

	US‑compatible electrical plug

Line Item 5: M16x1 Insulated Hose, 150 cm

Minimum Technical Requirements:

	Hose length of 150 cm minimum for connection between vessel jacket and circulator

	M16x1 connector type

	Insulated to maintain thermal efficiency during semi‑automated temperature control

	Minimum 2 units required

Line Item 6: M16 PEEK Vessel Side Arm Connectors

Minimum Technical Requirements:

	Connector constructed from PEEK material for high chemical resistance

	Must fit M16 side‑arm ports on Reactor‑Ready vessels

	Supports automated fluid transfer and jacket circulation

Line Item 7: CC‑K6 with Pilot One, 4.5 L, 110&ndash;120 V

Minimum Technical Requirements:

	Heating/cooling circulator with 4.5 L capacity and 110&ndash;120 V power compatibility

	Must integrate with Reactor‑Ready Mini vessels for automated or semi‑automated temperature control

	Pilot One controller interface with programmable temperature profiles

	Stable, precise temperature regulation suitable for research‑grade reactions

Line Item 8: E‑Grade Professional

Minimum Technical Requirements:

	Software or accessory enabling enhanced automation and process control features

	Must support semi‑automated workflows

	Provides professional‑grade user interface and data functionality

Line Item 9: Connection Cable

Minimum Technical Requirements:

	Supports integrated/semi‑automated operation of controller and reactor components

	Durable insulation and lab‑safe materials

Line Item 10: Condenser Jacket Coil &ndash; Rodaviss B19 + GL14 + Fittings

Minimum Technical Requirements:

	Jacketed condenser coil compatible with Reactor‑Ready Mini system vessels

	Rodaviss B19 joint, GL14 fittings included

	Must support semi‑automated condensation and thermal control when paired with circulator

	Chemical‑resistant materials suitable for research‑grade reactions

Please review all applicable documentation and provide a proposal response no later than 3:00 PM CST September 11, 2026.

Within your proposal, please include a fully executed copy of the ANL-70 Request for Quotation, the ANL-70A Reps & Certs, and the country of origin.

Any questions can be directed to the Contracting Officer.

Thank you in advance for your participation.

## Attachments

- [Appendix A-71COM-22-OCT-2025.PDF](https://sam.gov/api/prod/opps/v3/opportunities/resources/files/78ba4e1a96a44a90a78559f86b9817ee/download)

## Publications

- September 8, 2026: Solicitation, due September 11, 2026 at 4:00 PM EDT. Notice 44a14a8ac94f4e728690a210711c3256. https://sam.gov/workspace/contract/opp/44a14a8ac94f4e728690a210711c3256/view

## Points of contact

- Laura Sanchez, sanchezL@anl.gov, 6302521621

---
Source: SAM.gov Contract Opportunities bulk extract. Confirm deadlines on SAM.gov before responding. Cite https://abierto.us/opportunities/6b185q0043300.
