Combined synopsis and solicitation, service-disabled veteran-owned small business set-aside

WCHCS New Medgas Systems Replacement

36C25924Q0758

Department of Veterans Affairs, Network Contract Office 19. Surgical and Medical Instrument Manufacturing.

Response deadline

September 20, 2024 at 5:00 PM EDT

Closed 728 days ago. Posted September 17, 2024, first published August 29, 2024. Scheduled to archive October 5, 2024.

Description

As published on SAM.gov.

Can you provide a copy of your most recent Annual Medical Gas Inspection report? See attachments Can you provide floor plans showing the equipment and master alarm panel locations? See attachments Can you provide pictures of the current Master Alarm Panels? There should be a minimum of two per NFPA 99 requirements. See photos Are the following functions monitored on both Master Alarm Panels for the Medical Air and Medical Vacuum systems being replaced?

This is required per NFPA 99 5.1.9.2 and system Verification under NFPA 99 5.1.12.4.5.2 a. Medical Air Line Pressure Low b. Medical Air Line Pressure High c. Medical Air Dew Point High d. Medical Air Lag Compressor In Use, CO Level High (These can be 1 alarm) e. Medical Vacuum Line Pressure Low f. Medical Vacuum Lag Pump In Use See photos What floor is the mechanical room(s) located on for the Medical Air and Medical Vacuum systems?

Med Vac Third floor Med Air Basement Will the systems have to be disassembled to be transported to the mechanical room(s)? Unknown Is there a loading dock at the building where the systems are being installed? The VA has a loading dock Is there an identified path from the receiving area to the mechanical room(s) and will there be any challenges getting the equipment there? Unknown Will there be temporary systems required or a back feed?

No back feed will have to divert What is the size of the existing housekeeping pad for the Medical Vacuum System? 96 x 76 What is the material of the existing medical vacuum pump exhaust piping? Copper What is the size of the existing medical vacuum exhaust piping? 3 1/8 O.D. Where does the medical vacuum exhaust piping exit the building? Third floor roof Is the medical vacuum exhaust turned down/screened? N/a Is the medical vacuum exhaust 10 from windows/doors and 25 from air intakes?

N/a Is the existing medical vacuum exhaust brazed or soldered? N/a What is the size of the Medical Vacuum distribution piping? See attachments What is the size of the existing Medical Air intake? 3 Is the existing Medical Air intake brazed? N/a Where does the Medical Air intake exit the building? N/a Is the Medical Air intake at least 25 from exhausts, 10 from operable doors and windows, and 20 off the ground? N/a Is the Medical Air system required to be put on a housekeeping pad?

Please install a housekeeping pad Are the mechanical spaces temperature-controlled? Not exactly Does the facility have an electrical contractor that is familiar with the facility? Please provide contact information. Hawk Contracting Group is familiar with the facility

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 29, 2024

    Combined synopsis and solicitation

    Replacement Medical Air Compressor System and Vacuum Pump Grand Junction VA Medical Center

    Due September 13, 2024 at 5:00 PM EDT. SAM.gov, notice 1378c7939528441abba3b66a1e969061

  2. September 13, 2024

    Combined synopsis and solicitation

    Replacement Medical Air Compressor System and Vacuum Pump Grand Junction VA Medical Center

    Due September 20, 2024 at 5:00 PM EDT. SAM.gov, notice db28d76a4d6e43b58befe65dbf34e70a

  3. September 17, 2024

    Combined synopsis and solicitation

    Due September 20, 2024 at 5:00 PM EDT. SAM.gov, notice b19f5cc64cdd488daa2331c4d73bedf1

Points of contact