Combined synopsis and solicitation, service-disabled veteran-owned small business set-aside
Boiler Steam Safety Valves replaced New Requirement
36C24824Q1138
Department of Veterans Affairs, 248-Network Contract Office 8. Plumbing, Heating, and Air-Conditioning Contractors.
Awarded
$247,359.99 obligated so far on USAspending
Description
As published on SAM.gov.
Boiler Steam Safety Valves replacement The purpose of this amendment is to:
1. Questions provided by contractors are due on July 5, 2024, at 12:00pm.
2. Extend the closing date of solicitation to July 12, 2024. Updated Statement of Work is shown below:
Background: The Lake City VA Medical Center in Lake City, Florida has needs to have the Boiler Steam Safety Valves replaced with new cast steel safety valves. The VA is replacing cast iron fittings in the steam system with cast steel fittings. Other deficiencies have been identified and those deficiencies will also be corrected.
Objective: Upgrade the boilers at the Lake City VA to clear all deficiencies identified during routine inspection.
Scope of Work: Coordinate all work with the Contracting Officers Representative (COR) Replace with new, 6 Combustion Air Flow switches. Two on each boiler. Replace with new, 6 Purge Air Flow switches. Two on each boiler. Replace with new, 2 High Gas Pressure switches (1 natural gas, 1 propane) and install Audible Alarm to ring out in the Plant for both. Replace Boiler 3 Disconnect in VFD Panel. Replace Condensate Pump Control Panel and all the internals in that panel. Replace with new, 4 Boiler estops.
One by each door. Replace with new, 2 Pressure Relief Valves for the two reducing stations supplying steam to the DA (cast steel). To include drip pan 90s and the drains run from those 90s. Replace with new, 6 Boiler Steam Safety Valves. Two on each boiler (cast steel). To include drip pain 90s and the drains run from those 90s. Valves shall be sized and installed correctly to meet VA and BEI standards. Re-pipe all 6 Boiler Steam Safety discharge pipes with larger piping.
(Piping must be straight and sized correctly for the safety valves they serve to ensure proper steam discharge from plant.) Test all new safety valves to ensure they are functioning are sized correctly. Valves must pass inspection and meet VA compliance once installed and inspected. All Safety valves shall include drip pan 90s and adequate discharge piping to ensure correct operation per VA standard, BEI standard.
Core bore and repair the new roof penetrations for the new discharge piping. (roof must be resealed) Discharge the new piping through the roof. Terminate discharge piping at same elevation from roof surface as the existing vents. Set and test all new switches to ensure they are functioning and compliant. Provide all documentation to the COR.
Materials: 3 Cast Steel Safety Valves (1 per boiler) Kunkle Model 300 or approved equal Setpoint 145 psi Capacity 6183 lb/hr 3 Cast Steel Safety Valves (1 per boiler) Kunkle Model 300 or approved equal Setpoint 150 psi Capacity 10458 lb/hr 1 Cast Steel Pressure Relief Valve Kunkle Model 300 or approved equal Setpoint 25psi Capacity 2000 lb/hr 1 Cast Steel Pressure Relief Valve Kunkle Model 300 or approved equal Setpoint 60psi Capacity 3700 lb/hr Estops : 4 each 4 pole Emergency Stop Control Stations Pressure Switches: 12 each Antunes Controls JD-2 Red 0.1 24 W.C.
Pressure Switch for Gas in to Boiler Plant: 1 each Ashcroft 0-30 psi Condensate Pump Control Panel All components in the box Disconnect Switch for Boiler 3 Qualifications/Certifications: The Contractor Technician shall possess: Technician shall possess at least five years of experience working on Boilers to perform the services listed in the SOW. The contractor and all individuals working on the project site must have taken the OSHA Certified 10-hour safety course.
Safety Regulations: All OSHA safety regulations shall be observed during the project. The VA Safety Officer shall have full authority to see that the contractor obeys all safety rules and regulations relative to the fulfillment of this project. Provide the necessary barricades/signage where required.
Scheduling and Hours of Work: All work in areas involved shall be scheduled with the COR. The 10 holidays observed by the Federal Government, are New Years Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving Day, and Christmas or any other day specifically declared by the President of the United States to be a national holiday.
Evaluation/Selection Factor: The project must be performed by a contractor that has the capability and capacity to perform the job. Managerial expertise, technical expertise, past performance, and, cost will be considered.
The contract, on USAspending
Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.
- Recipient
- Rjy Group LLC
- UEI
- N593JWU6B5A7
- CAGE
- 5YJ43
- Vendor location
- Houston, TX
- Contract
- 36C24824P2012, purchase order
- Obligated
- $247,359.99
- Actions
- 2 between July 23, 2024 and September 3, 2024
- Competition
- Competed Under SAP, 4 offers received
- Set-aside reported
- Service Disabled Veteran Owned Small Business SET-ASIDE
- Described as
- Boiler Room Valves Replacement
- Match
- solicitation number 36C24824Q1138 equals the FPDS solicitation identifier; same awarding office 36C248 (high confidence)
- Record
- USAspending award page
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
June 12, 2024
Combined synopsis and solicitation
Due June 21, 2024 at 3:00 PM EDT. SAM.gov, notice 308b3481a64b4a829d09f55034ce97cc
June 18, 2024
Combined synopsis and solicitation
Due June 28, 2024 at 3:00 PM EDT. SAM.gov, notice 29d41980de374e2bbd65ef8657865e28
June 27, 2024
Combined synopsis and solicitation
Due July 12, 2024 at 3:00 PM EDT. SAM.gov, notice c2d0965c9b01403fa2f9bd086564bb5c
Points of contact
- Jose J Hernandez, Contract Specialistjose.hernandez@va.gov352-381-5708
Also open from this buyer
- Street Debris BlowersCombined synopsis and solicitationSmall businessNAICS 333112Bay Pines, FL36C24826Q1251Closes todaySep 18
- FY26: Artificial Intelligence Endoscopy ModuleSources soughtNAICS 334510San Juan, PR36C24826Q1222Closes todaySep 18
- PHARMACY IV PREP SYSTEMSources soughtNAICS 541519Puerto Rico36C24826Q1191_1Closes todaySep 18
- FY27 NRM (PROJ 516-26-117) BB Repair Steam Piping in Manhole Near Building 1SolicitationSDVOSBNAICS 236220Bay Pines, FL36C24827Q0004-1Closes todaySep 18
- FY26 Condenser Pumps and MotorSolicitationNAICS 333611Florida36C24826Q1236Closes todaySep 18