Combined synopsis and solicitation, service-disabled veteran-owned small business set-aside

689-26-3-4807-0126: Replace Variable Frequency Drive Units (VA-26-00053945)

36C24126Q0551

Department of Veterans Affairs, 241-Network Contract Office 01. Plumbing, Heating, and Air-Conditioning Contractors.

Awarded

Sterileco LLC

$92,000.00 obligated so far on USAspending

Description

As published on SAM.gov.

Amendment No.:

0002 Solicitation No.:

36C24126Q0551 Date: June 16, 2026 Purpose of Amendment The purpose of this amendment is to provide responses to questions submitted regarding the solicitation. As a result of these questions and responses, the response due date will be extended to June 23, 2026 at 10am.

Question: Please clarify if a superintendent can be a dual hat to cover the requirements of SSHO?

Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the SSHO need to be full-time for this project?

Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please clarify if a superintendent can be a dual hat to cover the requirements of QA/QC?

Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: If no to the question above, will the QA/QC need to be full time for this project?

Answer: Personnel performing startup of equipment should be those with the qualifications necessary to the specific equipment. Please submit appropriate installation report(s) as required along with equipment warranties. Question: Can a superintendent be a triple hat to cover the requirements of SSHO and QA/QC?

Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Please confirm if tax should be included in our proposal?

Answer: This is not construction, this is a professional services contract. Construction management is not required. A site superintendent is not required for professional services contracts. Applicable persons performing certified labor shall meet OSHA requirements for the applicable work area and work being performed where qualified personnel perform equipment start up and verification.   Question: Advise what is the ICRA Level required for the areas of the VFDs.

Answer: This question has been addressed previously. The contractor is responsible for determining any applicable tax obligations, incorporating into proposals as necessary. The VA cannot provide tax advice or make tax determinations on behalf of the contractor.

Question: Is the use of temporary plastic wall panels (such as STARC panels) acceptable to meet ICRA requirements?

Answer: The VFD's are in multiple mechanical spaces throughout the facility. There's no single ICRA level that applies to all locations. The Contractor shall coordinate with the government prior to commencing work in each area as the ICRA requirements will be determined based on the specific location, adjacent patient care activities, and scope of work.

Question: Confirm project work hours. Can work be completed during normal work hours?

Answer: The acceptability of temporary containment systems. Cannot be determined generically for this project. Requirements will vary based on specific work location activities and ICRA requirements.

Question: Will shutdowns be required to be done during off hours or weekends?

Answer: Normal business hours no off time schedule is required.

Question: Description of Services line 4 states to coordinate with FMS for BMS controls connections to VFDs. Advise if BMS controls connections, programming setup, and integration to BMS are by the VA. Is the contractor to only coordinate schedule and activities?

Answer: Connection is to be made by contractor. Programming setup, and integration to BMS are by the VA. Â The contractor to only coordinate schedule and activities with VA.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

Recipient
Sterileco LLC
UEI
WLTYUH8JY357
CAGE
9CAE7
Vendor location
Indianapolis, IN
Contract
36C24126P0581, purchase order
Obligated
$92,000.00
Actions
1 between August 11, 2026 and August 11, 2026
Competition
Competed Under SAP, 3 offers received
Set-aside reported
Service Disabled Veteran Owned Small Business SET-ASIDE
Described as
West Haven Vamc Variable Frequency Drives
Match
solicitation number 36C24126Q0551 equals the FPDS solicitation identifier; same awarding office 36C241 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. June 3, 2026

    Combined synopsis and solicitation

    Variable Frequency Drive Units VA Connecticut Healthcare System West Haven VA Medical Center

    Due June 16, 2026 at 12:00 PM EDT. SAM.gov, notice febb39854dfe4e0f87dc7f6d389280e4

  2. June 11, 2026

    Combined synopsis and solicitation

    Variable Frequency Drive Units VA Connecticut Healthcare System West Haven VA Medical Center

    Due June 16, 2026 at 12:00 PM EDT. SAM.gov, notice b53c2f3bd3944dd684c12d35fdc34257

  3. June 16, 2026

    Combined synopsis and solicitation

    Due June 23, 2026 at 10:00 AM EDT. SAM.gov, notice d9ccbd384e1543fda50bca2113b5eb9c

Points of contact