Cooling Tower Drive Train Replacement

25-R438025

Department of Energy, Jefferson Lab - DOE Contractor. Plumbing, Heating, and Air-Conditioning Contractors.

Response deadline

May 20, 2025 at 5:00 PM EDT

Closed 486 days ago. Posted May 13, 2025. Scheduled to archive June 4, 2025.

Description

As published on SAM.gov.

Replace the entire drive train on the cooling tower cells. Drive train parts to be replaced include the fan shaft, bearings, sheaves, bushings, belt and motor. Replacement fan parts shall be factory provided and assembled and installed to match previously removed. After removal of the old parts, inspect mechanical supports for defects and report any findings, install of new parts, and verify proper operation and fan rotation after install is complete.

The cooling towers for this project are all manufactured by Baltimore Aircoil Company (BAC). Additionally, each cooling tower is equipped with a Baltidrive PowerTrain. If your company has experience working with partial disassembly, reassembly, and replacement of cooling tower motor drivetrains, and you are interested in competing for award, please register for this requirement on the Jefferson Lab Solicitation Bulletin Board at https://misportal.jlab.org/ul/bus_ops/.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 13, 2025

    Sources sought

    Due May 20, 2025 at 5:00 PM EDT. SAM.gov, notice 77e3d787f0c042a9ba6ece7a24e975dc