Skip to content
Abierto

Justification

Additional requirements for A/E services related to the Electric Upgrade Work. The awarded contractor has completed the phase I project back in 2021.

19PK5025Q7002

Department of State, American Consulate Lahore. Architectural, Engineering, and Related Services.

Awarded

Project Engineering & Management Services

$23,985.89 obligated so far on USAspending, June 25, 2025, contract 19PK5025P7116

Description

As published on SAM.gov.

Identification of the agency and the contracting activity:This is a justification for other than full and open competition for an acquisition being conducted by the Department of State, General Services Office of the U.S. Consulate General Lahore, Pakistan. Nature and/or description of the action being approved.

PR15275741- LHE FAC A/E Services for the Electrical Upgrade Study at CGOB Sec II has been submitted, along with the original Scope of Work (SOW) and additional details required to complete the remaining A/E service tasks listed in the SOW. Previously, under Purchase Order 19PKS021P7159 awarded on November 01, 2021, three project tasks were assigned to the contractor Project Engineering & Management Services. The contractor successfully completed the study work related to the first part of the SOW.

All deliverables under the previous PO were submitted on time, accepted by 080 Electrical, and met the required standards. Given the contractor's proven performance and familiarity with the project scope, it is considered the most suitable and efficient option to engage the same firm for completing the remaining tasks- namely Task 4, Task 5, and additional items outlined in the updated SOW.

A description of the supplies or services required to meet the Agency's needs Consulate compound is very old and in past it went through many changes that includes changes of generator sizes, inclusion of HAT1s, Police village, and move of all USDH residences to office building. Existing installations, all electrical panels, Fire Alarms and other systems are very old and potential cause of failure at any time. Electrical wiring and panels are not code compliant and have safety issues.

Grounding is also not code compliant. It is recommended to first conduct a detail study to first understand complete scope of compound electrical upgrade scope and estimates. It is therefore recommended to hire services of engineering firm to first audit, report and then provide scope of work for these proposed upgrades.

The contract, on USAspending

Federal procurement data the awarding office reported to FPDS, matched to this solicitation by its number.

UEI
VKLXGLB7F233
CAGE
SLFA5
Vendor location
Islamabad
Contract
19PK5025P7116, purchase order
Obligated
$23,985.89
Actions
1 between June 24, 2025 and June 24, 2025
Competition
Not Competed Under SAP, 1 offer received
Set-aside reported
No Set Aside Used.
Described as
Lhe Fac AE Services for Electrical Upgrade Study Cgob-Sec II
Match
award number 19PK5025P7116 equals the contract number; same awarding office 19PK50 (high confidence)

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. August 26, 2025

    Justification

    SAM.gov, notice 1cbc083e6b9f4d498afa4ae0e3a8b76b

Points of contact