Skip to content
Abierto

Solicitation, total small business set-aside

WESTON HILLS 2024

140L6224R0008

Bureau of Land Management, Wyoming State Office. Highway, Street, and Bridge Construction.

Response deadline

August 19, 2024 at 4:00 PM EDT

Closed 760 days ago. Posted July 30, 2024. Scheduled to archive September 3, 2024.

Description

As published on SAM.gov.

Furnishing labor, equipment, supplies, and materials to perform ditch blading (75 feet), install one eighteen (18) inch CMP culvert 25 ft. in length. Repair existing 10 water bars, screen and stockpile 150 cubic yards of in-situ borrow with a 3 inch minus screen. Rejected aggregate greater than 3 inches can remain at the borrow site. The stockpiled aggregate will also be at the borrow site. The contractor shall provide at least one week notice to the BLM before starting work on the road. The road has aggregate surfacing. A Pre-award site visit will occur at the Weston Road.

Location: Work under this Contract is in Campbell County, Wyoming. Weston Hills road entrance: 44.6371, -105.33629 Weston Hills In-situ borrow area and stockpile area: 44.63858, -105.38081. Weston Hills 18¿ CMP culvert installation and ditch blading: 44.64308, -105.38584 Existing water bars repair, TBD upon pre-bid site visit.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. July 30, 2024

    Solicitation

    Due August 19, 2024 at 4:00 PM EDT. SAM.gov, notice aa3bea4d05e84659bc28bdddb8c808f7

Points of contact