64 awards and $20,444,869 obligated between January 3, 2024 and September 2, 2026, 100% under full and open competition, against 1.0 offers on average where reported. 6 of the awards trace back to a SAM.gov solicitation on this site.

Sells to

Awarding agencies by dollars.

Environmental Protection Agency$20,444,869

Industries

NAICS on the awards, by dollars.

Environmental Consulting ServicesNAICS 541620$20,444,869

How it wins

Awards by competition, set-aside and type.

Full and Open Competition64
Delivery Order62

Solicitations it won

SAM.gov opportunities whose award USAspending attributes to this vendor.

  • Region 4 Superfund Technical Assessment & Response

    Environmental Protection Agency, Construction, Finance, Administrative & Ia Division

    Award noticeNAICS 541620Duluth, GA68HE0P24R0007

    Awarded to Tetra Tech, Inc. for $63,676,799

    Posted Jul 96 publications

Awards

Every award in the window, by dollars obligated.

ContractAwarding officeDescribed asObligated
68HE0420F0040Delivery Order, June 24, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySouthside Chattanooga Lead Remedial Action (Start), Extend the Period of Performance and Change the Alternate Cor.NAICS 541620, PSC R429$2,656,816
68HE0420F0049Delivery Order, April 2, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyAdministrative Modification to Modify Tolins, Funding Action Only.NAICS 541620, PSC R429$2,213,411
68HE0423F0043Delivery Order, April 23, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyStart Woolfolk Chemical Corporation, Add Funding in the Amount of $1,304,858.71, Attached Revised Statement of Work V2 and Extend the PeriodNAICS 541620, PSC R429$1,895,049
68HE0419F0082Delivery Order, January 23, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection Agency68HE0519D0006 68HE0419F0082 Start Funding Only Action ModificationNAICS 541620, PSC R429$1,650,000
68HE0426F0093Delivery Order, July 31, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyR4 Start VI Westside Lead Task OrderNAICS 541620, PSC R429$1,400,000
68HE0421F0079Delivery Order, June 7, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This Modification Is to Extend the Period of Performance to 01/14/2025.NAICS 541620, PSC R429$1,235,792
68HE0426F0095Delivery Order, August 12, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyR4 Start VI Emergency Response Cercla ActionsNAICS 541620, PSC R429$1,000,000
68HE0426F0100Delivery Order, August 18, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4 Start VI Preparedness and Prevention ActivitiesNAICS 541620, PSC R429$1,000,000
68HE0426F0101Delivery Order, August 24, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4 Start VI Superfund Removal Actions CerclaNAICS 541620, PSC R429$1,000,000
68HE0426F0102Delivery Order, September 2, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4 Start VI Removal Site EvaluationsNAICS 541620, PSC R429$1,000,000
68HE0519F0053Delivery Order, June 24, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencySuperfund Technical Assessment & Response Team (Start), Region 4, Task Order for Program and Administrative Overhead, Extend the Period of PNAICS 541620, PSC R429$935,145
68HE0426F0086Delivery Order, July 10, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4 Superfund Technical Assessment & Response Team VI Contract - Program and Administrative Task OrderNAICS 541620, PSC R429$898,133
68HE0419F0096Delivery Order, January 23, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection Agency68HE0519D0006 68HE0419F0096 P00031 Start Funding Only Action ModificationNAICS 541620, PSC R429$731,780
68HE0419F0097Delivery Order, June 13, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This Modification Is to Exercise the Option Under Authority FAR 52.217-8 to To/Do 68he0519d0006/68he0419f0097. the Period of NAICS 541620, PSC R429$600,000
68HE0525F0011Delivery Order, October 24, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyThe Initiation of Emergency Response Task Order for Hurricane Helene Response Under R4 Start V Contract 68HE0519D0006 and Add Funding in theNAICS 541620, PSC R429$555,677
68HE0420F0022Delivery Order, May 16, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection Agency68HE0519D0006 68HE0420F0022 Admin. Mod to Change Pop (P00044)NAICS 541620, PSC R429$549,555
68HE0424F0010Delivery Order, January 11, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyStart Site Assessment Decision ReviewNAICS 541620, PSC R429$307,880
68HE0421F0047Delivery Order, June 6, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyIncremental Funding ActionNAICS 541620, PSC R429$291,284
68HE0420F0078Delivery Order, July 16, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyConduct Actions Associated with Maintenance and Inspection of Frp/Spcc and NON-SITE Oil Activities as Specified Under Preparedness and PreveNAICS 541620, PSC R429$280,018
68HE0424F0006Delivery Order, March 8, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyAdministrative Modification to Contract 68HE0519D0006 Task Order 68HE0424F0006. the Purpose of the Modification Is to Update the Tocor. All NAICS 541620, PSC R429$229,936
68HE0419F0081Delivery Order, May 9, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyExtend the Period of Performance for Task Order 68HE0419F0081 (Oil Emergency Actions) Under Start V.NAICS 541620, PSC R429$200,000
68HE0426F0103Delivery Order, August 25, 2026, Full and Open CompetitionRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4 Start VI Superfund Facility Response Plans (Frp) and Spill Prevention Control and Countermeasures (Spcc)NAICS 541620, PSC R429$180,000
68HE0525F0022Delivery Order, November 20, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyInitiation of Emergency Response Task Order for Hurricane Helene Response Tennessee Under Start V Contract 68HE0519D0006 and Obligate Funds NAICS 541620, PSC R429$71,692
68HE0422F0051Delivery Order, February 7, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyInitiation of a Site-Specific Task Order (Assessment/Inspection Activities) for GMH Electronics Under Start V Contract 68HE0519D0006. ModifiNAICS 541620, PSC R429$71,675
68HE0420F0048Delivery Order, January 3, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyAdmin Change to Correct Pop End DateNAICS 541620, PSC R429$70,178
68HE0524F0068Delivery Order, June 24, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyRegion 4, (Start V); Task Order for Work at Highland Auto Site Under Start V Contract 68HE0519D0006; Pre-Cercla Screening and Site InspectioNAICS 541620, PSC R429$52,045
68HE0524F0063Delivery Order, June 18, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyRegion 4, (Start V); Initiation of a Site-Specific Task Order for the HI-PARK Cleaners Site Under Start V Contract 68HE0519D0006 to Conduct NAICS 541620, PSC R429$51,436
68HE0422F0003Delivery Order, June 13, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This Modification Is to Extend the Period of Performance to 01/14/2025.NAICS 541620, PSC R429$50,000
68HE0422F0057Delivery Order, July 11, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySuperfund Technical Assessment & Response Team (Start), Region 4 P00004 - Cor Change (Southeastern Wood Preserving) Alt Cor Kehinde OgunsusiNAICS 541620, PSC R429$49,430
68HE0525F0010Delivery Order, October 24, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyThe Initiation of Emergency Response Task Order for Hurricane Helene Support Under R4 Start V Contract #68HE0519D0006 and Add Funding in theNAICS 541620, PSC R429$33,055
68HE0525F0012Delivery Order, October 24, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyThe Initiation of Emergency Task Order for Hurricane Helene Landfill Strike Team Under Start V Contract 68HE0519D0006 and Add Funding in theNAICS 541620, PSC R429$25,811
68HE0420F0087Delivery Order, January 3, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyCorrect Pop End DateNAICS 541620, PSC R429$20,737
68HE0423F0044Delivery Order, July 11, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySite-Specific Task Order for the U.S. Fireworks Under Start V Contract 68HE0519D0006 to Conduct and Expanded Site Inspection.NAICS 541620, PSC R429$13,748
68HE0524F0067Delivery Order, June 14, 2024, Full and Open Competition, 1 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyRegion 4, (Start V); Task Order for Work at the Loeb'S Laundry Site Contract: 68HE0519D0006.NAICS 541620, PSC R429$9,625
68HE0421F0010Delivery Order, June 6, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This Modification Is to Extend the Period of Performance to 01/14/2025.NAICS 541620, PSC R429$0
68HE0422F0024Delivery Order, June 13, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This Modification Is to Extend the Period of Performance to 01/14/2025.NAICS 541620, PSC R429$0
68HE0423F0032Delivery Order, April 19, 2026, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySuperfund Technical Assessment & Response Team (Start), Region 4 (Site Assessment Activities) Stone'S Throw Landfill (Site Assessment ActiviNAICS 541620, PSC R429$0
68HE0519D0006April 4, 2024, Full and Open Competition, 2 offersRegion 5 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This PR Is to Exercise Option Under Authority FAR 52.217-8 Contract 68HE0519D0006. Superfund Technical Assessment & Response NAICS 541620, PSC R429$0
68HERF26D0013July 9, 2026, Full and Open Competition, 2 offersSolicitation Construction, Finance, Administrative & Ia DivisionEnvironmental Protection AgencyRegion 4 Superfund Technical Assessment & Response Team VI ContractNAICS 541620, PSC R429$0
68HE0423F0037Delivery Order, April 10, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySuperfund Technical Assessment & Response Team (Start), Region 4 Modification to Deobligate Funding for Closeout.NAICS 541620, PSC R429-$2
68HE0422F0045Delivery Order, June 6, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyR429: Professional Emergency Response for R4 Task Order Under Start 5 Site Assessment Activities for Fairfield Neighborhood - CloseoutNAICS 541620, PSC R429-$11
68HE0423F0008Delivery Order, May 1, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyTask Order for High Resolution Site Characterization (Hrsc) Dnapl Source Area STLR Project. Deobligation of Funds and Closing of To.NAICS 541620, PSC R429-$19
68HE0421F0062Delivery Order, April 3, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySuperfund Technical Assessment & Response Team (Start), Region 4 - Southern Laundry Site Specific Task Order (Assessment/Inspection ActivitiNAICS 541620, PSC R429-$21
68HE0420F0045Delivery Order, March 28, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4 - Superfund Technical Assessment & Response Team (Start), Site Specific Task Order (Assessment/Inspection Activities) for Westside NAICS 541620, PSC R429-$28
68HE0423F0013Delivery Order, April 11, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySite-Specific Task Order for Birmingham Urban Background Study - Deobligation Funding and Close Out of Existing To.NAICS 541620, PSC R429-$45
68HE0423F0001Delivery Order, July 13, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyExtend Period of Performance for Six Months to January 14, 2025 at No Additional Cost to the GovernmentNAICS 541620, PSC R429-$156
68HE0422F0078Delivery Order, April 14, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyStart RRT Planning and Support Services - Close Out of Existing Task Order and Removal of Excess FundingNAICS 541620, PSC R429-$435
68HE0420F0080Delivery Order, July 18, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection Agency(Start), Region 4, Closeout Task Order/De-Obligate Funds.NAICS 541620, PSC R429-$583
68HE0423F0017Delivery Order, July 12, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyExtend Pop Six Months Ending Date January 14, 2025 at No Additional Cost to the GovernmentNAICS 541620, PSC R429-$1,143
68HE0420F0054Delivery Order, July 16, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyCloseout Task Order/De-Obligate Funds.NAICS 541620, PSC R429-$2,295
68HE0423F0065Delivery Order, January 16, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyAdd Alternate Tocor/PocNAICS 541620, PSC R429-$3,590
68HE0423F0084Delivery Order, July 18, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection Agency(Start), Region 4; Closeout Task Order/De-Obligate Funds.NAICS 541620, PSC R429-$5,701
68HE0422F0049Delivery Order, April 3, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyStart V Contract Wells Cleaner - De-Obligation and Closeout of Task OrderNAICS 541620, PSC R429-$6,852
68HE0421F0051Delivery Order, February 22, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyThe Purpose of This Modification Is to De-Obligate $14,981.18 from Contract 68HE0519D0006 Task Order 68HE0421F0051. Additionally, Task OrderNAICS 541620, PSC R429-$14,981
68HE0420F0081Delivery Order, July 23, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection Agency(Start), Region 4, Closeout Task Order/De-Obligate Funds.NAICS 541620, PSC R429-$25,958
68HE0423F0045Delivery Order, April 10, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyStart Hunter Fan Modification to Deobligate Funding for Closeout.NAICS 541620, PSC R429-$30,905
68HE0422F0025Delivery Order, July 23, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyRegion 4, Start V Contract; Closeout Task Order/De-Obligate Funds.NAICS 541620, PSC R429-$34,822
68HE0421F0064Delivery Order, June 5, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyModification 4 Is to Extend the Period of Performance to This Task Order.NAICS 541620, PSC R429-$37,826
68HE0423F0087Delivery Order, February 12, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyAdministrative Modification to Change Tocor, All Other Terms and Conditions Remain Unchanged.NAICS 541620, PSC R429-$51,403
68HE0422F0035Delivery Order, April 2, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencySuperfund Technical Assessment & Response Team (Start), Region 4 - De-Obligation and Closeout of Task OrderNAICS 541620, PSC R429-$55,001
68HE0422F0084Delivery Order, April 14, 2025, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyFormer Tampa Fertilizer Site - Close Out of Existing to and Removal of Excess FundingNAICS 541620, PSC R429-$55,295
68HE0423F0048Delivery Order, July 12, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyExtend Period of Performance to Six Months Ending Date January 14, 2025 at No Additional Cost to the Government.NAICS 541620, PSC R429-$60,479
68HE0422F0065Delivery Order, June 6, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyTask Order Under Start 5 Contract for Former Custom Cleaners Remedial Action. the Purpose of This Modification Is to Extend the Period of PeNAICS 541620, PSC R429-$127,757
68HE0421F0006Delivery Order, July 23, 2024, Full and Open Competition, 1 offersRegion 4 Contracting OfficeEnvironmental Protection AgencyStart V Contract 68HE0519D0006, (Start), Region 4; Closeout Task Order/De-Obligate Funds.NAICS 541620, PSC R429-$369,730
Places of performance
GeorgiaTennessee
Transactions