Skip to content
Abierto

Combined synopsis and solicitation, total small business set-aside

CJAG Power Distribution

W9136426P0000040397

Department of the Army, W7NU Uspfo Activity Oh Arng. Power and Communication Line and Related Structures Construction.

Offers due

September 21, 2026 at 10:00 PM EDT

4 days from now. Posted September 9, 2026, first published September 8, 2026.

Description

As published on SAM.gov.

Amendment: 1

Bonding Requirements:

An offer guarantee IS required

Contractor must furnish any required performance and payment bonds within 10 calendar days after receipt of order (ARO)

~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~

The contractor shall provide all personnel, equipment, tools, materials, supervision, and quality control necessary to construct the CJAG Load Line 6 Electrical System.

The requirement includes construction of approximately 1,400 linear feet of underground medium-voltage electrical service terminating at a new pad-mounted transformer at the Load Line 6 area of Camp James A. Garfield Joint Training Center.

The contractor shall perform all work in accordance with Attachment 1, including all requirements for utility coordination, route surveying, underground utility location, trenching, conduit installation, concrete encasement, backfill and compaction, cable installation, transformer installation, grounding, testing, energization, restoration, quality control, safety, security, and required deliverables.

Site Visits are encouraged, call 1SG Brian Persing 330-984-8130 or CW2 Grant Stoner 614-336-6580.  Do not contact these individuals for any reason other than coordinating site visit.

Attachments

Files listed on SAM.gov. The ones we hold a copy of download from here; the rest open SAM's download, which needs no account.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 8, 2026

    Combined synopsis and solicitation

    Due September 21, 2026 at 10:00 PM EDT. SAM.gov, notice a47748d034204b7db3ec68b8ed1d0271

    2 revisions on SAM
    • September 9, 2026: publish, combined synopsis and solicitation
    • September 8, 2026: publish, combined synopsis and solicitation
  2. September 9, 2026

    Combined synopsis and solicitation

    Due September 21, 2026 at 10:00 PM EDT. SAM.gov, notice 55293ae6c4424fb8a8d21c00df2a01b0

    2 revisions on SAM
    • September 9, 2026: publish, combined synopsis and solicitation
    • September 8, 2026: publish, combined synopsis and solicitation

Points of contact