Special notice
Notice of Intent-Brand Name or Equal-VA Greater Los Angeles LA
W912PL24S0002
Department of the Army, W075 Endist Los Angeles. Commercial and Institutional Building Construction.
Response deadline
January 31, 2024 at 5:00 PM EST
Closed 960 days ago. Posted January 3, 2024. Scheduled to archive February 15, 2024.
Description
As published on SAM.gov.
The U.S. Army Corps of Engineers (USACE), Los Angeles District (SPL) has an announcement regarding its intent to use a Triple Friction Pendulum (TFP) isolation system in the final design of a new project to construct a New 450,000 GSF Critical Care Center on West Los Angeles VA Campus of the Greater Los Angeles Veteran Affairs Healthcare System (GLAVAHS) in Los Angeles CA. This project is expected to be over $500M.
There are only two types of isolation systems, Lead Rubber Bearing (LRB) and Triple Friction Pendulum (TFP), capable of satisfying the government requirements. Based upon the details contained in the designer’s Structural Basis of Design Narrative and Base Isolation Comparison Narrative, the government intends to further develop its design based on using a TFP System.
Critical Care Center Project Scope This project scope is for a new 450,000 GSF Critical Care Center, new Central Utility Plant, Selective Renovation of Building 500, and the related site utilities, at the West Los Angeles VA Medical Center in Los Angeles, CA.
The new facility will include a mental health ward, surgery suites, pre-operative services, PACU, ICU, Anesthesiology and all support functions for surgery, pharmacy, in-patient intake, radiology, Pathology, Morgue, Central Sterilization, EVS/EVS, and Emergency care service. The facility will have 160 beds of which 44 will be in the mental health ward.
The location of the new Critical Care Center will be just south of the current Hospital, Building 500. This project will be constructed to meet U.S. Green Building Council LEED Silver version 4 standards. Submission request to demonstrate capabilities for this project include:
Enclosed with this notice are two documents 1) Structural Basis of Design Narrative and 2) Base Isolation Comparison Narrative, which form the basis of the government’s intent to use the TFP System. The main criteria considered include displacement, accelerations, fire rating, base shear, building periods, and self-centering.
The primary emphasis being the ability of the system to minimize structural and non-structural damage during an earthquake and to maintain full functionality of the building during and after an earthquake to the facility. Interested parties are encouraged to provide information for consideration if another system can achieve better results than those indicated in the enclosed documents. Responses to this notice are due no later than January 31, 2024. Please direct your responses by e-mail to james.m.costantino@usace.army.mil.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
January 3, 2024
Special notice
Due January 31, 2024 at 5:00 PM EST. SAM.gov, notice ba040c97aeb547dda303a2ab7a3d6c87
Points of contact
- James Costantinojames.m.costantino@usace.army.mil2134523237
Also open from this buyer
- RIO DE FLAG FLOOD CONTROL PROJECT ��������� PHASE 4 LOWER RDF INLETSources soughtW912PL26S0050Closes tomorrowSep 18
- Expand Emergency Power to HVAC SystemsSources soughtW912PL26S0052Closes in 4 daysSep 21
- Rio de Flag Flood Risk Management ProjectSources soughtW912PL26S0051Closes in 4 daysSep 21
- DISASTER RESILIENCY PROGRAM PHASE 3, CREECH AFB, NEVADASolicitationNAICS 236220W912PL26RA027Closes in 7 daysSep 24
- Multiple Award Task Order Contract (MATOC) Healthcare Facility Construction, Repair, and Renovation Services, ArizonaSources soughtW912PL26S0053Closes in 11 daysSep 28