Skip to content
Abierto

Solicitation, total small business set-aside

Solicitation for Modification of T Line in Building 340

W912NW-24-Q-0056

Department of the Army, W6QK Ccad Contr Off. Plumbing Fixture Fitting and Trim Manufacturing.

Response deadline

July 26, 2024 at 2:00 PM EDT

Closed 784 days ago. Posted July 23, 2024, first published May 16, 2024. Scheduled to archive August 10, 2024.

Description

As published on SAM.gov.

INSTRUCTIONS TO OFFERORS: SF1449 needs to be filled out completely, sign and return with quote submission. Please provide any technical information in a separate attachment. Please provide any additional pricing information in a separate attachment.

DRAWINGS: To request access to drawings, submit an email to the following:

Jay Russell: harold.w.russell.civ@army.mil Dawyn Martinez: dawyn.m.martinez.civ@army.mil 1.0 GENERAL: This is a non-personal services contract to modify the T line in the Advanced Metal Finishing Facility (AMMF).The Government will not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Scope: The Contractor shall provide all personnel, equipment, supplies, transportation, tools, materials, supervision, quality control, and other items and non-personal services necessary to modify the T line as defined in this PWS, except for materials that will be provided by the Government, as stated in paragraph 3.2 Materials. The Contractor shall perform to the standards of this contract.

1.2 Background: The AMMF T line (also known as the anodizing line) applies an anodized coating to aluminum components utilizing a series of chemical baths and water rinses. The first four tanks in this line (T1, T2, T3, and T4) are to be modified to allow the use of different chemistry. This modification will include installation of various components to the existing tanks, modification of the tanks, and relocation and reprogramming of PLC controls for the line.

1.3 Description of Services: The Contractor will modify the T line for the AMMF facility as specified by section 5.0 Requirements of this PWS.

1.4 Period of Performance (POP): The POP shall be six (6) months. The POP will be defined in the contract document. Please see attached documents for additional information.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. May 16, 2024

    Solicitation, originally sources sought

    Sources Sought for Modification of T Line in Building 340

    Due May 31, 2024 at 1:00 AM EDT. SAM.gov, notice 5d672264456544938a6e780e46ffb886

  2. May 16, 2024

    Solicitation

    Due May 31, 2024 at 1:00 AM EDT. SAM.gov, notice c963a4da864a400f8062cdf9bf3dd385

  3. May 21, 2024

    Solicitation

    Due May 31, 2024 at 1:00 AM EDT. SAM.gov, notice 89fb2fdf60694d3eb78b8f4fc6bb592b

  4. May 30, 2024

    Solicitation

    Due June 28, 2024 at 3:00 PM EDT. SAM.gov, notice 4efe511770e04ebbb86821fad4ceb7b4

  5. June 27, 2024

    Solicitation

    Due July 26, 2024 at 2:00 PM EDT. SAM.gov, notice 3e2af98ccb6f4866baaeb05cc7eda4f4

  6. July 23, 2024

    Solicitation

    Due July 26, 2024 at 2:00 PM EDT. SAM.gov, notice ed6f174026fe47edbac8331b44a5ed40

Points of contact