Skip to content
Abierto

Sources sought

Rapid Response Requirement for a 50kw propane-fueled generator set

W912HN25C00SM

Department of the Army, W074 Endist Savannah. Motor and Generator Manufacturing.

Response deadline

October 4, 2024 at 12:00 PM EDT

Closed 714 days ago. Posted October 3, 2024, first published October 2, 2024. Scheduled to archive October 19, 2024.

Description

As published on SAM.gov.

We would like to know who can perform this work and how soon we can have delivery, removal and installation. See attached DRAFT Statement of Work for Request for Information (RFI) Purposes ONLY. The Contractor shall replace the existing 50 kW diesel generator, diesel fuel tank and automatic transfer switch (ATS) with a new generator, new fuel tank and ATS. The existing generator set, fuel tank and ATS located in the Lock Operations Building shall be demolished, removed and disposed of by the Contractor.

The existing diesel fuel tank is located on the first floor of the Lock Operations Building behind a chain-link fence.The existing generator set and ATS are located on the second level of the Lock Operations Building. A new propane-fueled generator set, propane fuel tank and ATS shall be provided and installed on the land-side pavilion between the Lock Operations Building and the public parking area. The new generator, fuel tank and ATS shall be located on a new elevated equipment pad constructed adjacent to the existing service transformer.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. October 2, 2024

    Sources sought

    Due October 4, 2024 at 12:00 PM EDT. SAM.gov, notice 455035c28cd14a818af7b67799f09625

  2. October 3, 2024

    Sources sought

    Due October 4, 2024 at 12:00 PM EDT. SAM.gov, notice aafa1fe3413d45219ee7a4789f0282f8

Points of contact