Skip to content
Abierto

Solicitation, first published as presolicitation

Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY).

W912EQ26RA001

Department of the Army, W07V Endist Memphis. Other Heavy and Civil Engineering Construction.

Response deadline

April 21, 2026 at 11:00 AM EDT

Closed 150 days ago. Posted April 10, 2026, first published November 25, 2025. Scheduled to archive April 10, 2027.

Description

As published on SAM.gov.

Stringout Construction (Rehabilitation) at Ensley Engineer Yard (EEY) The work consists of furnishing all labor, materials, tools, and equipment to complete the work as shown and as specified for the Stringout Replacement at EEY, and incidental related work. The project is divided into a base project and six (6) options.

The work involves: Removal of the existing steel ramp that extends from the yard to the floating docks; Demolition and removal of existing ramp abutment; Removal of existing timber piles, steel pipe piles, and concrete piles; Demolition and removal of concrete piles and pile caps from existing railroad trestle; Excavation, dredging and disposal of materials; Installation of steel floats (GFE); Installation of a new landing barge; Providing new steel pipe piles and steel-framed pile clusters; Providing donut fenders; Providing new utilities (electrical power, lighting, lightning protection, potable water, fire water, telecom, compressed air); Construction of a new steel connector bridge; Construction of an electrical substation, including equipment foundation; Construction of abutment and landside approach to the connector bridge; All earthwork activities for connector bridge; and all incidental related work.

The base project work shall be completed sequentially from Phase 1 to Phase 2, to allow continued operation of the Ensley Engineer Yard. Phase 1 shall be completed before the start of Phase 2.For options when awarded, they they shall be completed in the sequence directed by the Government.

Acquisition Strategy: The acquisition will be conducted as an unrestricted procurement with a HUBZone Price Evaluation Preference, using a Best Value Tradeoff source selection process.

Magnitude of Construction: Between $25,000,000 and $100,000,000.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. November 25, 2025

    Presolicitation

    SAM.gov, notice 812f91e8ee5344db90d17139e0e59c17

  2. January 30, 2026

    Solicitation

    Due March 19, 2026 at 11:00 AM EDT. SAM.gov, notice 12967b10b4d74b59bb84d8ccb5a25f0b

  3. February 11, 2026

    Solicitation

    Due March 19, 2026 at 11:00 AM EDT. SAM.gov, notice c5d8331ba64442fa96b1fee035807bd4

  4. February 27, 2026

    Solicitation

    Due March 19, 2026 at 11:00 AM EDT. SAM.gov, notice 644bfbb5002e4841a54bb175f931a547

  5. March 9, 2026

    Solicitation

    Due April 14, 2026 at 11:00 AM EDT. SAM.gov, notice 4ae91bdfefbd41089206833030e5e0cc

  6. March 23, 2026

    Solicitation

    Due April 14, 2026 at 11:00 AM EDT. SAM.gov, notice 0ae5661cce234f689a8f7a39eae55fa6

  7. April 10, 2026

    Solicitation

    Due April 21, 2026 at 11:00 AM EDT. SAM.gov, notice 88d84c7d62474ae489102de39d6753cb

Points of contact