Combined synopsis and solicitation, total small business set-aside
RFQ for CESAJ-EN Office Buildout 2026
W912EP26Q1BK0
Department of the Army, W074 Endist Jacksnvlle. Wood Office Furniture Manufacturing.
Response deadline
June 10, 2026 at 2:00 PM EDT
Closed 100 days ago. Posted June 10, 2026, first published May 26, 2026. Scheduled to archive August 26, 2026.
Description
As published on SAM.gov.
*Amended to update Response Time from 1000 EDT to 1400 EDT on Wednesday, June 10, 2026, due to technical issues experienced with PIEE website at the original time quotes were due* SUMMARY OF WORK-The site of this project is the Army Corps of Engineers (USACE) Engineering Division?s Design Branch (EN-D), Cost Engineering Branch (EN-C), both on 3rd floor East and the Geosystems Branch (EN-GE) on 3rd floor West, located at 701 San Marco Blvd, Jacksonville, FL 32207 The purpose of this project is to provide five enclosed office spaces for supervisory personnel.
The first location (Design Branch) is to transform three (joined) existing cubicle spaces into three fully enclosed offices, by way of installing floor to ceiling walls, doors, and glass. The second location (Cost Engineering Branch) is to transform one existing corner cubicle space into a single fully enclosed office, by way of installing floor to ceiling walls, doors, and glass.
The third location (Geosystems Branch) is to transform one existing cubicle space into a single fully enclosed office, by way of installing floor to ceiling walls, doors, and glass. All five build-outs will allow the transfer of natural light from existing windows within EN-D, EN-C and EN-GE. USACE Engineering Division requires the services of a commercial contractor to provide the supplies and services needed to complete this transformation.
The USACE Office Building is not owned by the Federal Government, it is privately owned, and it is subject to the requirements of U.S. General Services Administration (GSA) and Bradford Allen. Provide the five office build-outs, a suite of (modern style) office furniture (desk, task chair, credenza, bookshelf and two side chairs).
The contractor will furnish adequate supervision, personnel, equipment, supplies, facilities, transportation, tools, materials, and other items to perform all services as defined in the Performance Work Statement except for those items specified as government furnished property and services. The contractor shall perform according to the contract in an orderly, timely and efficient manner.
Unless otherwise indicated, items of work are inclusive of, but not limited to, all labor, materials, equipment, traffic control, safety measures, replacement of disrupted improvements, coordination, preparation and accommodation of project constraints (whether specifically identified in these specifications or encountered during the contract) necessary to complete the item in conformance with all applicable governing agency regulations and specifications to the satisfaction of the Government and inspecting agency.
Items of work that are necessary to complete the project in accordance with the plans and specifications if any, but that are not specifically called out in the Schedule of Unit Prices, are considered incidental to the project and not subject to separate compensation. Contractor shall install/connect new walls to existing walls and fill voids between new wall panel and curtain wall with sound attenuating material and matching new wall surface(s). Contractor shall connect walls to make 5x office enclosures. Site Visit Scheduling POC are the following:
Primary: Anthony (Tony) Nolan, Architect, Engineering Division; anthony.p.nolan@usace.army.mil, Office:
904-570-4538 Alternate: Thomas Crutchfield, Facility Specialist (Logistics); thomas.j.crutchfield@usace.army.mil Office: 904-232-1191 Cell:360-632-1078
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
May 26, 2026
Combined synopsis and solicitation
Due June 10, 2026 at 10:00 AM EDT. SAM.gov, notice a3ce397a0e9048e19ac25e2be4de140d
May 27, 2026
Combined synopsis and solicitation
Due June 10, 2026 at 10:00 AM EDT. SAM.gov, notice e2da6307c90d492ebac934582ed8e162
June 2, 2026
Combined synopsis and solicitation
Due June 10, 2026 at 10:00 AM EDT. SAM.gov, notice 9dbf1249542a4f768cc3f88bcef76575
June 10, 2026
Combined synopsis and solicitation
Due June 10, 2026 at 2:00 PM EDT. SAM.gov, notice c85945f0426e4995a7088b9d1c56cda2
Points of contact
- Ligaya Loweligaya.m.lowe@usace.army.mil9042322750
- Gerald Garveygerald.l.garvey@usace.army.mil9042323055
Also open from this buyer
- Recruiting Station - Armed Forces Career Center - St. Thomas, VISolicitationNAICS 531190U.S. Virgin IslandsDACA175270000200Closes in 19 daysOct 7
- FORT PIERCE HARBOR MAINTENANCE DREDGING, ST. LUCIE COUNTY, FLORIDASolicitationNAICS 237990W912EP26BA015Closes in 34 daysOct 22
- Palm Beach Harbor, South Jetty Rehabilitation 2026, Palm Beach County, FloridaPresolicitationNAICS 237990W912EP26BA019Closes in 35 daysOct 23