SWC 2nd Priority Design-Build MATOC - Pre-solicitation Notice

W912EK25RA015

Department of the Army, W07V Endist Rock Island. Other Heavy and Civil Engineering Construction.

Response deadline

November 30, 2025 at 3:00 PM EST

Closed 292 days ago. Posted November 18, 2025, first published September 17, 2025. Scheduled to archive December 15, 2025.

Description

As published on SAM.gov.

Updated 18-Nov-2025: This pre-solicitation is being cancelled. A new pre-solicitation will be published at least 15 days prior to a solicitation for subject requirement being issued in accordance with FAR 5.203 "Publicizing and response time" and FAR 36.213-2 "Presolicitation notices". The estimated solicitation date is unknown at this time.

The US Army Corps of Engineers (USACE) - Rock Island District intends to issue a two-phased solicitation for establishing a design-build construction Indefinite-Quantity Multiple-Award Task Order Contract (IDIQ MATOC) with a total shared capacity not to exceed $99M (million) to provide the design and construction of floodproofing for up to 371 individual structures as part of the Southwest Coastal Louisiana Nonstructural Storm Risk Management Project (SWCLA).

Please note that the acquisition strategy has not changed since the related notice was issued.

This source selection will be carried out in accordance with FAR 36.301“Use of two-phase design-build selection procedures”, which can be found at www.acquisition.gov, and Engineering Regulation ER 1180-1-9 “Design-Build Contracting” which can be found at https://www.publications.usace.army.mil/USACE-Publications/Engineer-Regulations/udt_43546_param_orderby/Pub_x0020_Number/udt_43546_param_direction/descending/ USACE anticipates issuing Phase I in fall of 2025 but there is no set date at this time.

This notice is related to the draft-RFP notice W912EK25RA001 that was issued in April 2025. While the scope of this planned MATOC is smaller, it is possible that USACE may issue a solicitation for a second larger MATOC should there be a bona fide need for it in the future. If USACE determines that an Industry Day is feasible within the solicitation schedule either this notice will be updated, or a related notice will be issued.

Please be sure to Follow this notice, which requires vendors to be logged into their SAM.gov account, so as to be notified when this notice is updated, or a related notice is issued. This is a pre-solicitation notice only, and proposals submitted in response to this notice will NOT be reviewed or accepted.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. September 17, 2025

    Presolicitation

    Due October 30, 2025 at 3:00 PM EDT. SAM.gov, notice 7f048fe6aa9d47cfb18e1cfcaf8bfb3b

  2. September 17, 2025

    Presolicitation, originally special notice

    SWC DESIGN-BUILD MATOC - DRAFT RFP

    Due October 30, 2025 at 3:00 PM EDT. SAM.gov, notice 81bcfb1dd7bd461e9ede965eeb308f88

  3. November 18, 2025

    Presolicitation

    Due November 30, 2025 at 3:00 PM EST. SAM.gov, notice 5e17cbd098de49b8b7ab2e0bd4a0b5c9

  4. November 18, 2025

    Presolicitation

    Due November 30, 2025 at 3:00 PM EST. SAM.gov, notice 6972d96608a3451989b364fa93a4bbcd