Solicitation, women-owned small business set-aside
W912DY26RA063
W912DY26RA063
Department of the Army, W2V6 USA Eng SPT CTR Huntsvil. Site Preparation Contractors.
Response deadline
May 7, 2026 at 11:00 AM EDT
Closed 133 days ago. Posted April 28, 2026. Scheduled to archive April 27, 2027.
Description
As published on SAM.gov.
The US Army Corps of Engineers, Engineering and Support Center, Redstone Arsenal, AL, has been tasked with initiating a Facility Reduction requirement at the USMC, Twentynine Palms, California.Pre-Demolition Surveys according to the requirements set forth in the Performance Work Statement (PWS) is for various buildings at the site. The objective is to plan and complete the environmental sampling of facilities at the installation.
The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB?s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner.
All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion.
The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results.
The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
April 28, 2026
Solicitation
Due May 7, 2026 at 11:00 AM EDT. SAM.gov, notice fec068aae82049ac9ed2b2fe33085efe
Points of contact
- Lynn Thomaslynn.m.thomas@usace.army.mil2568957713
Also open from this buyer
- AFCEC 2026 FIAR SupportSolicitation8(a)NAICS 518210TexasW912DY26QA321Closes in 3 daysSep 20
- Facilities Reduction Program IV (FRP) Solicitation - Official - Amendment 0002SolicitationNAICS 238910W912DY26RA022Closes in 7 daysSep 24
- SPD-AF Fuels Maintenance and RepairSolicitationNAICS 561210W912DY26RA006Closes in 7 daysSep 24
- Bliss Barracks Repairs for Multiple Building(s) Fort Bliss, TX RFPSolicitationNAICS 236220W912DY26RA137Closes in 7 daysSep 24
- RFP for Moody AFB AHU Repair NTOSolicitationNAICS 236220W912DY26RMAFBCloses in 13 daysSep 30