RFQ Ft. Riley AABC Hangar Industrial Storage

W912DY26QA078

Department of the Army, W2V6 USA Eng SPT CTR Huntsvil. Office Furniture (except Wood) Manufacturing.

Response deadline

April 6, 2026 at 9:00 AM EDT

Closed 164 days ago. Posted March 24, 2026, first published March 5, 2026. Scheduled to archive March 24, 2026.

Description

As published on SAM.gov.

Ft. Riley, Kansas Casegoods This Amendment 0002 is issued to Incorporate the following:

1. Cancellation of RFQ W912DY26QA078 Ft. Riley AABC Hangar Industrial Storage, due to building will not be ready until FY27. All other terms and conditions remain unchanged. The Purpose of this Amendment 0001 is to Incorporate the following:

a. Incorporate Government responses to vendor questions. All other terms and conditions remain unchanged. This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in Subpart 12.6 – Streamlined Procedures for Evaluation and Solicitation for Commercial Items, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested, and a separate written solicitation document will not be issued.

This solicitation is being issued under the authority of FAR Part 13 Simplified Acquisition Procedures. The requirement is to procure casegoods that will be used at Ft. Riley, Kansas. The combined synopsis/solicitation/Request For Quote (RFQ) number is W912DY-26-Q-A078. This number shall be referenced by contractors on their quotes and related correspondence. This RFQ is full and open competition.

The NAICS code is 337214. Contractors must be registered in the System of Award Management (SAM) with no exclusions in order to be considered for award. The website for SAM is:

https://www.sam.gov/portal/public/SAM/. Contractor is required to sign this document and return 1 copy to issuing office. Contractor agrees to furnish and deliver all items set forth or otherwise identified above and on any additional sheets subject to the terms and conditions specified. Signature of offeror/contractor:

Name and Title of Signer:

Quotes must be sent to Contract Specialist Salednika McKenzie, salednika.i.mckenzie@usace.army.mil No later than 06 April 2026, 8:00 AM Central Standard Time. Please submit questions NLT 12 March 8:00AM Central Standard Time. The contract will be a Firm Fixed Price (FFP) with the CLIN structure as reflected below.

CONTRACT LINE ITEMS: Item No Supplies Services Quantity Unit Unit Price Amount 0001 Furnishings: Ft. Riley, Industrial Storage 1 Unit Item No Supplies Services Quantity Unit Unit Price Amount 0002 Storage: Ft. Riley, Industrial Storage 6 Months

Please submit quotes valid for 120 days

Freight On Board (FOB):

Destination Furniture Installation Start Date (FISD):

02 September 2026 Furniture Installation Completion Date (FICD):

11 November 2026 Furniture Installation Location: Ft. Riley, Kansas The following attachments are included in this RFQ:

(1) Attachment 1, Line-Item Pricing Spreadsheet (Excel Format) - To be completed by contractor and returned to the Government POC listed above.

(2) Attachment 2 - Furniture Item Description (FID) (3) Attachment 3 - Statement of Work (SOW) (4) Attachment 4 – Contractor Performance Evaluation (5) Attachment 5 – Accident Prevention Plan Worksheet (6) Attachment 6 – Order Completion Statement (4) Attachment 7, Technical Document Checklist - To be completed by contractor and returned to the Government POC listed.

(5) Furniture Plans & Drawings (For Drawing file (2) please email salednika.i.mckenzie@usace.army.mil) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The successful contractor will be the one whose quote is rated acceptable on technical, schedule and past performance, and provides the best value to the Government. Best value will be determined by the quote that is technically acceptable and has the lowest total price. The following factors shall be used to evaluate offers:

(1) Price;

(2) Past Performance;

(3) Technical capability of the item(s) offered to meet the Government requirement;

(4) Schedule Amendments to this RFQ will be provided in the same manner as the initial RFQ, which is by public notice on https://sam.gov/.

Publications

Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.

  1. March 5, 2026

    Combined synopsis and solicitation

    Due April 6, 2026 at 9:00 AM EDT. SAM.gov, notice ddeed558b7744564975ee8ffab85a7d6

  2. March 17, 2026

    Combined synopsis and solicitation

    Due April 6, 2026 at 9:00 AM EDT. SAM.gov, notice e033532fad274d4e80d2b7b0748632ae

  3. March 24, 2026

    Combined synopsis and solicitation

    Due April 6, 2026 at 9:00 AM EDT. SAM.gov, notice 30e3ae993ad143e19084c43b262020c5

  4. March 24, 2026

    Combined synopsis and solicitation

    Due April 6, 2026 at 9:00 AM EDT. SAM.gov, notice 35b4ce39afa54548b53149340ec1cd63

Points of contact