Sources sought
Architectural & Engineering Services in Support of Microgrid and Backup Power Design, Camp Walker, Republic of Korea (ROK)
W912DY25FA226-1
Department of the Army, W2V6 USA Eng SPT CTR Huntsvil. Engineering Services.
Response deadline
December 12, 2025 at 3:00 PM EST
Closed 279 days ago. Posted December 4, 2025. Scheduled to archive December 27, 2025.
Description
As published on SAM.gov.
This is a SOURCES SOUGHT NOTICE that is issued solely for informational and planning purposes and does not constitute a solicitation. This notice is for market research purposes only and IS NOT A REQUEST FOR PROPOSAL, nor does it restrict the Government as to the ultimate acquisition approach. This notice is open for responses from Korean Architect-Engineer (A-E) Firms Only and responses will be utilized to determine if this requirement can be set-aside for Korean A-E Firms.
The Government will not reimburse respondents for any cost incurred in preparation of a response to this notice. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to rank submittals or provide any reply to interested companies and responses will not be returned.
1. CONTRACT INFORMATION: The U.S. Army Corps of Engineers, Huntsville Engineering and Support Center (CEHNC) in Huntsville, Alabama, is conducting market research to identify qualified Korean A-E Firms capable of providing a range of services as part of the Energy Resilience & Conservation Investment Program (ERCIP), to include but not limited to the following:
Facility assessment, design development, cost estimation, cost and risk assessment, utility coordination, other associated studies or project support. These services will support all facilities on Camp Walker, ROK. The Government is performing market research to determine if any Korean A-E Firms possess the capability to execute the requirements within this acquisition.
Interested Korean A-E Firms who meet the capability requirements identified in this notice are requested to reply to this notice with a response to the questions below. If no experience or capabilities are associated with a particular question, please specify. All Korean A-E Firms must be registered in the System for Award Management (SAM).
2. PROJECT INFORMATION: Contractors (KTRs) must have the capability to develop a 100% Design Bid Build package, to include the development of cost estimates and design and construction schedules, of a smart microgrid system to provide energy resilience for all facilities on Camp Walker, ROK, in support of DoD and other Government agencies and activities. All products must be in English.
The project will include 1,650KWdc rooftop and carport Photovoltaic (PV) solar arrays, 4,000KW diesel generator capacity, a 6,000KW/3,000KWh Battery Energy Storage System (BESS), microgrid controls, transformers, and switches. The project includes new carports, and structural upgrades and replacement of building roof systems to support the PV solar arrays. The project will integrate 2.5MW of existing diesel generator capacity into the microgrid.
Also included in the project is commissioning and testing, cybersecurity, electric service, site improvements, information systems, and environmental air permitting. KTRs will coordinate interconnection agreements with Korea Electric Power Corporation. KTRs should have familiarity with Unified Facilities Criteria (UFC) and Unified Facility Guide Specifications (UFGS).
3. SUBMISSION REQUIREMENTS: Interested firms should submit a document which furnishes information describing relevant demonstrated experience and qualifications in the following format: The submissions should be Times New Roman, font size 12 and should not exceed 10, one-sided, 8 ½" X 11" pages. The submission will address all questions in the Capabilities Questionnaire listed below and your ability to perform the services stated in the above notice. Submit responses via email to:
Antonio Mastin, antonio.l.mastin@usace.army.mil and Cole Harris, cole.p.harris@usace.army.mil. Submissions shall be received NO LATER THAN 2:00 P.M. Central Time on 12 December 2025 (or sooner). NO HARDCOPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED. Cover letters and extraneous materials (brochures, etc.) will not be considered. Personal visits for the purpose of discussing this announcement will not be scheduled.
4. CAPABILITIES QUESTIONNAIRE SECTION I: GENERAL a. Business Name: (Insert Business Name) b. Business Address: (Insert Business Address) c. Cage Code/UEI: d. Responsible Point of Contact: (Insert name, address, phone number, and email address)
Publications
Every notice SAM.gov issued under this solicitation number, oldest first. Each is a separate record on SAM.
December 4, 2025
Sources sought
Due December 12, 2025 at 3:00 PM EST. SAM.gov, notice db29c1b1f90344259a65867b00b7c717
Points of contact
- Antonio L. Mastinantonio.mastin@usace.l.army.mil256-895-7357
- Cole P. Harriscole.p.harris@usace.army.mil256-895-1107
Also open from this buyer
- W912DY26RA030 OFFICIAL SOLICITATION_ AMENDMENT 2 FOR UTILITY MONITORING AND CONTROL SYSTEMS VICombined synopsis and solicitationNAICS 541512W912DY26RA030Closes todaySep 17
- AFCEC 2026 FIAR SupportSolicitation8(a)NAICS 518210TexasW912DY26QA321Closes in 3 daysSep 20
- Facilities Reduction Program IV (FRP) Solicitation - Official - Amendment 0002SolicitationNAICS 238910W912DY26RA022Closes in 7 daysSep 24
- SPD-AF Fuels Maintenance and RepairSolicitationNAICS 561210W912DY26RA006Closes in 7 daysSep 24
- Bliss Barracks Repairs for Multiple Building(s) Fort Bliss, TX RFPSolicitationNAICS 236220W912DY26RA137Closes in 7 daysSep 24